Image from Google Jackets

Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: vii,80pDDC classification:
  • CPM TH-0305 BAR
Contents:
Contents Acknowledgement iii Abstract iv List of Figures v List of Tables vi List of Abbreviations vii 1. Introduction 1 1.1 Need for Study 2 2. Research Design 3 2.1 Research Gap 3 2.2 Objective of Research 3 2.3 Methodology 3 3. Working Capital in Construction Industry 5 Terms Corelating with WCM 5 Working Capital in Construction Industry 7 Factors affecting cash inflows & outflows of construction projects 9 4. Real-Estate Regulatory Act 11 5. Literature Review 15 5.1 Literature Review Table 18 6. Preliminary Survey 25 6.1 Method used for data collection 25 6.2 Data Analysis 26 6.3 Output of Preliminary Survey 27 7. Case Studies 29 7.1 Case Study-1 30 Data Collection 30 Data Analysis 36 7.2 Case Study-2 49 Data Collection 49 Data Analysis 55 7.3 Case Study-3 64 Data Collection 64 Data Analysis 65 8 Conclusion 72 8.1 Summary of Case Studies 72 8.2 Risks that can lead to RERA Non-compliances 74 9. Future Scope 76 10 References 78 Annexure 80 Annexure A: Questionnaire for Preliminary Survey 80 Annexure B: Details of Respondents 81
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0305 BAR Not for loan 019987
Total holds: 0

Contents
Acknowledgement iii
Abstract iv
List of Figures v
List of Tables vi
List of Abbreviations vii
1. Introduction 1
1.1 Need for Study 2
2. Research Design 3
2.1 Research Gap 3
2.2 Objective of Research 3
2.3 Methodology 3
3. Working Capital in Construction Industry 5
Terms Corelating with WCM 5
Working Capital in Construction Industry 7
Factors affecting cash inflows & outflows of construction projects 9
4. Real-Estate Regulatory Act 11
5. Literature Review 15
5.1 Literature Review Table 18
6. Preliminary Survey 25
6.1 Method used for data collection 25
6.2 Data Analysis 26
6.3 Output of Preliminary Survey 27
7. Case Studies 29
7.1 Case Study-1 30
Data Collection 30
Data Analysis 36
7.2 Case Study-2 49
Data Collection 49
Data Analysis 55
7.3 Case Study-3 64
Data Collection 64
Data Analysis 65
8 Conclusion 72
8.1 Summary of Case Studies 72
8.2 Risks that can lead to RERA Non-compliances 74
9. Future Scope 76
10 References 78
Annexure 80
Annexure A: Questionnaire for Preliminary Survey 80
Annexure B: Details of Respondents 81

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials