Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available) (Record no. 55120)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01644nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0305 |
Item number | BAR |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Baroliya, Ravi (PT100216) |
245 #0 - TITLE STATEMENT | |
Title | Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vii,80p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgement iii<br/>Abstract iv<br/>List of Figures v<br/>List of Tables vi<br/>List of Abbreviations vii<br/>1. Introduction 1<br/>1.1 Need for Study 2<br/>2. Research Design 3<br/>2.1 Research Gap 3<br/>2.2 Objective of Research 3<br/>2.3 Methodology 3<br/>3. Working Capital in Construction Industry 5<br/>Terms Corelating with WCM 5<br/>Working Capital in Construction Industry 7<br/>Factors affecting cash inflows & outflows of construction projects 9<br/>4. Real-Estate Regulatory Act 11<br/>5. Literature Review 15<br/>5.1 Literature Review Table 18<br/>6. Preliminary Survey 25<br/>6.1 Method used for data collection 25<br/>6.2 Data Analysis 26<br/>6.3 Output of Preliminary Survey 27<br/>7. Case Studies 29<br/>7.1 Case Study-1 30<br/>Data Collection 30<br/>Data Analysis 36<br/>7.2 Case Study-2 49<br/>Data Collection 49<br/>Data Analysis 55<br/>7.3 Case Study-3 64<br/>Data Collection 64<br/>Data Analysis 65<br/>8 Conclusion 72<br/>8.1 Summary of Case Studies 72<br/>8.2 Risks that can lead to RERA Non-compliances 74<br/>9. Future Scope 76<br/>10 References 78<br/>Annexure 80<br/>Annexure A: Questionnaire for Preliminary Survey 80<br/>Annexure B: Details of Respondents 81 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Trivedi, Rajnikant (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0305 BAR | 019987 | 08/09/2018 | 08/09/2018 | Thesis |