Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available)
Baroliya, Ravi (PT100216)
Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available) - 2018 - vii,80p.
Contents
Acknowledgement iii
Abstract iv
List of Figures v
List of Tables vi
List of Abbreviations vii
1. Introduction 1
1.1 Need for Study 2
2. Research Design 3
2.1 Research Gap 3
2.2 Objective of Research 3
2.3 Methodology 3
3. Working Capital in Construction Industry 5
Terms Corelating with WCM 5
Working Capital in Construction Industry 7
Factors affecting cash inflows & outflows of construction projects 9
4. Real-Estate Regulatory Act 11
5. Literature Review 15
5.1 Literature Review Table 18
6. Preliminary Survey 25
6.1 Method used for data collection 25
6.2 Data Analysis 26
6.3 Output of Preliminary Survey 27
7. Case Studies 29
7.1 Case Study-1 30
Data Collection 30
Data Analysis 36
7.2 Case Study-2 49
Data Collection 49
Data Analysis 55
7.3 Case Study-3 64
Data Collection 64
Data Analysis 65
8 Conclusion 72
8.1 Summary of Case Studies 72
8.2 Risks that can lead to RERA Non-compliances 74
9. Future Scope 76
10 References 78
Annexure 80
Annexure A: Questionnaire for Preliminary Survey 80
Annexure B: Details of Respondents 81
CPM TH-0305 / BAR
Changes in working capital management pursuant to implementation of RERA (2016) (Softcopy is also available) - 2018 - vii,80p.
Contents
Acknowledgement iii
Abstract iv
List of Figures v
List of Tables vi
List of Abbreviations vii
1. Introduction 1
1.1 Need for Study 2
2. Research Design 3
2.1 Research Gap 3
2.2 Objective of Research 3
2.3 Methodology 3
3. Working Capital in Construction Industry 5
Terms Corelating with WCM 5
Working Capital in Construction Industry 7
Factors affecting cash inflows & outflows of construction projects 9
4. Real-Estate Regulatory Act 11
5. Literature Review 15
5.1 Literature Review Table 18
6. Preliminary Survey 25
6.1 Method used for data collection 25
6.2 Data Analysis 26
6.3 Output of Preliminary Survey 27
7. Case Studies 29
7.1 Case Study-1 30
Data Collection 30
Data Analysis 36
7.2 Case Study-2 49
Data Collection 49
Data Analysis 55
7.3 Case Study-3 64
Data Collection 64
Data Analysis 65
8 Conclusion 72
8.1 Summary of Case Studies 72
8.2 Risks that can lead to RERA Non-compliances 74
9. Future Scope 76
10 References 78
Annexure 80
Annexure A: Questionnaire for Preliminary Survey 80
Annexure B: Details of Respondents 81
CPM TH-0305 / BAR