Rethinking project development process through use of building information modelling (Also available on CD)
Material type: TextPublication details: 2018Description: a,ii,4,viii,52p.,CD-ROMDDC classification:- B TH-0742 PAN
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | B TH-0742 PAN | Not for loan | 019799 |
CONTENTS
1. Introduction 1
1.1 Background 1
1.2 Need for the study 1
1.3 Objectives 2
14 Scope and Limitation 2
1.5 Methodology 2
1.6 Study Timeline 3
2. Literature Study 4
2.1 Current Project Development process . 4
2.1.1 Overview . 4
2.1.2 Problems and challenges faced in current process – Global scenario 6
2.1.3 Need for the change 6
2.1.4 New opportunities with new technologies 6
2.2 Building Information Modelling 7
2.2.1 Overview . 7
2.2.2 Various Dimensions: 2D to 7D 8
2.2.3 Why BIM: Various benefits of using BIM 9
2.2.4 BIM and Data collaboration 10
2.2.5 Various BIM providers 10
2.3 BIM as a process 10
2.3.1 BIM workflow 18
2.3.2 Data integration and exchange 19
3. Data Collection 20
3.1 Case study selection criteria 13
3.2 Case study – Project Details 18
4. Data Analysis 23
4.1 Conceptualization & Design 23
4.2 Tender Stage 31
4.3 Construction: Analysis & Planning 44
4.4 Own & Operate 47
5 Conclusion 49
REFRENCES 52
There are no comments on this title.