Rethinking project development process through use of building information modelling (Also available on CD) (Record no. 54878)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02281nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0742 |
Item number | PAN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Panchal, Hitarth (UC2613) |
245 #0 - TITLE STATEMENT | |
Title | Rethinking project development process through use of building information modelling (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | a,ii,4,viii,52p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1. Introduction 1<br/>1.1 Background 1<br/>1.2 Need for the study 1<br/>1.3 Objectives 2<br/>14 Scope and Limitation 2<br/>1.5 Methodology 2<br/>1.6 Study Timeline 3<br/>2. Literature Study 4<br/>2.1 Current Project Development process . 4<br/>2.1.1 Overview . 4<br/>2.1.2 Problems and challenges faced in current process – Global scenario 6<br/>2.1.3 Need for the change 6<br/>2.1.4 New opportunities with new technologies 6<br/>2.2 Building Information Modelling 7<br/>2.2.1 Overview . 7<br/>2.2.2 Various Dimensions: 2D to 7D 8<br/>2.2.3 Why BIM: Various benefits of using BIM 9<br/>2.2.4 BIM and Data collaboration 10<br/>2.2.5 Various BIM providers 10<br/>2.3 BIM as a process 10<br/>2.3.1 BIM workflow 18<br/>2.3.2 Data integration and exchange 19<br/>3. Data Collection 20<br/>3.1 Case study selection criteria 13<br/>3.2 Case study – Project Details 18<br/>4. Data Analysis 23<br/>4.1 Conceptualization & Design 23<br/>4.2 Tender Stage 31<br/>4.3 Construction: Analysis & Planning 44<br/>4.4 Own & Operate 47<br/>5 Conclusion 49<br/>REFRENCES 52<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Bhatt, Viral (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0742 PAN | 019799 | 22/08/2018 | 22/08/2018 | Thesis |