Rethinking project development process through use of building information modelling (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: a,ii,4,viii,52p.,CD-ROMDDC classification:
  • B TH-0742 PAN
Contents:
CONTENTS 1. Introduction 1 1.1 Background 1 1.2 Need for the study 1 1.3 Objectives 2 14 Scope and Limitation 2 1.5 Methodology 2 1.6 Study Timeline 3 2. Literature Study 4 2.1 Current Project Development process . 4 2.1.1 Overview . 4 2.1.2 Problems and challenges faced in current process – Global scenario 6 2.1.3 Need for the change 6 2.1.4 New opportunities with new technologies 6 2.2 Building Information Modelling 7 2.2.1 Overview . 7 2.2.2 Various Dimensions: 2D to 7D 8 2.2.3 Why BIM: Various benefits of using BIM 9 2.2.4 BIM and Data collaboration 10 2.2.5 Various BIM providers 10 2.3 BIM as a process 10 2.3.1 BIM workflow 18 2.3.2 Data integration and exchange 19 3. Data Collection 20 3.1 Case study selection criteria 13 3.2 Case study – Project Details 18 4. Data Analysis 23 4.1 Conceptualization & Design 23 4.2 Tender Stage 31 4.3 Construction: Analysis & Planning 44 4.4 Own & Operate 47 5 Conclusion 49 REFRENCES 52
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0742 PAN Not for loan 019799
Total holds: 0

CONTENTS
1. Introduction 1
1.1 Background 1
1.2 Need for the study 1
1.3 Objectives 2
14 Scope and Limitation 2
1.5 Methodology 2
1.6 Study Timeline 3
2. Literature Study 4
2.1 Current Project Development process . 4
2.1.1 Overview . 4
2.1.2 Problems and challenges faced in current process – Global scenario 6
2.1.3 Need for the change 6
2.1.4 New opportunities with new technologies 6
2.2 Building Information Modelling 7
2.2.1 Overview . 7
2.2.2 Various Dimensions: 2D to 7D 8
2.2.3 Why BIM: Various benefits of using BIM 9
2.2.4 BIM and Data collaboration 10
2.2.5 Various BIM providers 10
2.3 BIM as a process 10
2.3.1 BIM workflow 18
2.3.2 Data integration and exchange 19
3. Data Collection 20
3.1 Case study selection criteria 13
3.2 Case study – Project Details 18
4. Data Analysis 23
4.1 Conceptualization & Design 23
4.2 Tender Stage 31
4.3 Construction: Analysis & Planning 44
4.4 Own & Operate 47
5 Conclusion 49
REFRENCES 52

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials