Rethinking project development process through use of building information modelling (Also available on CD)

Panchal, Hitarth (UC2613)

Rethinking project development process through use of building information modelling (Also available on CD) - 2018 - a,ii,4,viii,52p.,CD-ROM

CONTENTS
1. Introduction 1
1.1 Background 1
1.2 Need for the study 1
1.3 Objectives 2
14 Scope and Limitation 2
1.5 Methodology 2
1.6 Study Timeline 3
2. Literature Study 4
2.1 Current Project Development process . 4
2.1.1 Overview . 4
2.1.2 Problems and challenges faced in current process – Global scenario 6
2.1.3 Need for the change 6
2.1.4 New opportunities with new technologies 6
2.2 Building Information Modelling 7
2.2.1 Overview . 7
2.2.2 Various Dimensions: 2D to 7D 8
2.2.3 Why BIM: Various benefits of using BIM 9
2.2.4 BIM and Data collaboration 10
2.2.5 Various BIM providers 10
2.3 BIM as a process 10
2.3.1 BIM workflow 18
2.3.2 Data integration and exchange 19
3. Data Collection 20
3.1 Case study selection criteria 13
3.2 Case study – Project Details 18
4. Data Analysis 23
4.1 Conceptualization & Design 23
4.2 Tender Stage 31
4.3 Construction: Analysis & Planning 44
4.4 Own & Operate 47
5 Conclusion 49
REFRENCES 52


B TH-0742 / PAN
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials