Study of cost factor that affect a construction project (Softcopy is also available) (Record no. 55130)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01407nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0315 |
Item number | PRA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Pratap, Mayuresh (PT101216) |
245 #0 - TITLE STATEMENT | |
Title | Study of cost factor that affect a construction project (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vi,91p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of figures v<br/>List of tables vi<br/>1. Introduction 1<br/>2. Need for study 3<br/>3. Objective 5<br/>4. Scope of study 5<br/>5. Research methodolgy 6<br/>5.1. Literature review 6<br/>5.2. Data collection & analysis 6<br/>6. Literature review 7<br/>6.1. Introduction 7<br/>6.2. Review 7<br/>7. Interview Question 27<br/>8. Thesis Schedule 29<br/>9. Data Collection & Analysis 31<br/>9.1. Introduction 31<br/>9.2. Quantitative Data Collection & Analysis 31<br/>9.2.1.Data Collection for Quantitative Analysis 31<br/>9.2.2.Quantitative Data Analysis 32<br/>9.2.3.Validity and reliability of questionnaire survey 38<br/>9.3. Qualitative data collection & analysis 47<br/>9.3.1.Qualitative data collection 47<br/>9.3.2.Qualitative data analysis 48<br/>9.4. Result Summary 49<br/>9.5. Comparison with previous study 52<br/>10. Conclusion 53<br/>11. Future Scope 54<br/>References 55<br/>Annexures A 56<br/>Annexures B 64 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sanghvi, Amar (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0315 PRA | 019997 | 08/09/2018 | 08/09/2018 | Thesis |