Study of cost factor that affect a construction project (Softcopy is also available)

Pratap, Mayuresh (PT101216)

Study of cost factor that affect a construction project (Softcopy is also available) - 2018 - vi,91p.

Contents
Acknowledgements iii
Abstract iv
List of figures v
List of tables vi
1. Introduction 1
2. Need for study 3
3. Objective 5
4. Scope of study 5
5. Research methodolgy 6
5.1. Literature review 6
5.2. Data collection & analysis 6
6. Literature review 7
6.1. Introduction 7
6.2. Review 7
7. Interview Question 27
8. Thesis Schedule 29
9. Data Collection & Analysis 31
9.1. Introduction 31
9.2. Quantitative Data Collection & Analysis 31
9.2.1.Data Collection for Quantitative Analysis 31
9.2.2.Quantitative Data Analysis 32
9.2.3.Validity and reliability of questionnaire survey 38
9.3. Qualitative data collection & analysis 47
9.3.1.Qualitative data collection 47
9.3.2.Qualitative data analysis 48
9.4. Result Summary 49
9.5. Comparison with previous study 52
10. Conclusion 53
11. Future Scope 54
References 55
Annexures A 56
Annexures B 64

CPM TH-0315 / PRA
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials