Reduction of through put time (TPT) in electrotherm (India) ltd. by using value stream mapping (VSM) in production shop floor-panel shop
Material type: TextPublication details: 2012Description: iii,81pDDC classification:- MTM TH-0022 THA
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Management | MTM TH-0022 THA | Not for loan | 010091 |
Total holds: 0
There are no comments on this title.
Log in to your account to post a comment.