Reduction of through put time (TPT) in electrotherm (India) ltd. by using value stream mapping (VSM) in production shop floor-panel shop (Record no. 53469)

MARC details
000 -LEADER
fixed length control field 00549nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180517s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number MTM TH-0022
Item number THA
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Thacker, Jekin
245 #0 - TITLE STATEMENT
Title Reduction of through put time (TPT) in electrotherm (India) ltd. by using value stream mapping (VSM) in production shop floor-panel shop
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2012
300 ## - PHYSICAL DESCRIPTION
Extent iii,81p.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Arora, Nilesh (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Iyengar, Shreekant (Guide)
891 ## - Topic
Topic 2009 Batch
891 ## - Topic
Topic FM-PG
891 ## - Topic
Topic Master in Technology Management
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
        Faculty of Management   CEPT Library CEPT Library 11/07/2012 Faculty of Technology MTM TH-0022 THA 010091 18/05/2018 18/05/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials