Factors affecting project overhead costs estimation in Government construction projects (Also available on CD)
Material type: TextPublication details: 2017Description: ix,53p.,CD-ROMDDC classification:- CPM TH-0274 SHA
Contents:
CONTENTS Acknowledgements iii Abstract iv List of Figures v List of Tables v 1. Introduction 1 1.1. Background of the Research 1 1.2. Significance and Contributions of the Research 2 2. Research Design 4 2.1. Research Objective 4 2.2. Research M
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | CPM TH-0274 SHA | Not for loan | 018514 |
Total holds: 0
CONTENTS Acknowledgements iii Abstract iv List of Figures v List of Tables v 1. Introduction 1 1.1. Background of the Research 1 1.2. Significance and Contributions of the Research 2 2. Research Design 4 2.1. Research Objective 4 2.2. Research M
There are no comments on this title.
Log in to your account to post a comment.