Factors affecting project overhead costs estimation in Government construction projects (Also available on CD) (Record no. 50852)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00753nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0274 |
Item number | SHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Shah, Mohil |
245 #0 - TITLE STATEMENT | |
Title | Factors affecting project overhead costs estimation in Government construction projects (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2017 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,53p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS Acknowledgements iii Abstract iv List of Figures v List of Tables v 1. Introduction 1 1.1. Background of the Research 1 1.2. Significance and Contributions of the Research 2 2. Research Design 4 2.1. Research Objective 4 2.2. Research M |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Pandit, Devanshu (Guide) |
891 ## - Topic | |
Topic | 2015 Batch |
891 ## - Topic | |
Topic | Construction and Planning Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 13/10/2017 | Faculty of Technology | CPM TH-0274 SHA | 018514 | 18/05/2018 | 18/05/2018 | Thesis |