Analyzing the major causes for delay and subsequent cost overrun in container terminal projects (Also available on CD)
Material type: TextPublication details: 2016Description: vi,36,iip. CD-ROMDDC classification:- B TH-0616 JOS
Contents:
CONTENTS_x000D_ Preface Ii_x000D_ Abstract Iii_x000D_ List Of Abbreviations: 1_x000D_ Introduction . 1_x000D_ Background: . 1_x000D_ Need: . 2_x000D_ Objective: . 3_x000D_ Literature Study: 4_x000D_ Time Overrun 4_x000D_ Cost Overrun 5_x000D_ Research Met
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | B TH-0616 JOS | Not for loan | 016546 |
Total holds: 0
CONTENTS_x000D_ Preface Ii_x000D_ Abstract Iii_x000D_ List Of Abbreviations: 1_x000D_ Introduction . 1_x000D_ Background: . 1_x000D_ Need: . 2_x000D_ Objective: . 3_x000D_ Literature Study: 4_x000D_ Time Overrun 4_x000D_ Cost Overrun 5_x000D_ Research Met
There are no comments on this title.
Log in to your account to post a comment.