Analyzing the major causes for delay and subsequent cost overrun in container terminal projects (Also available on CD)

Joshi, Saransh

Analyzing the major causes for delay and subsequent cost overrun in container terminal projects (Also available on CD) - 2016 - vi,36,iip. CD-ROM

CONTENTS_x000D_ Preface Ii_x000D_ Abstract Iii_x000D_ List Of Abbreviations: 1_x000D_ Introduction . 1_x000D_ Background: . 1_x000D_ Need: . 2_x000D_ Objective: . 3_x000D_ Literature Study: 4_x000D_ Time Overrun 4_x000D_ Cost Overrun 5_x000D_ Research Met

B TH-0616 / JOS
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials