Risk analysis of elevated corridor project using Failure Mode and Effect Analysis (FMEA) and combined fuzzy FMEA (Also available on CD)
Material type: TextPublication details: 2013Description: 119p.,CD-ROMDDC classification:- CPM TH-0227 BHA
Contents:
CONTENT CHAPTER 1- INTRODUCTION 1.1Introduction9 1.1.1 Risk assessment9 1.1.2 Failure Mode and Effect Analysis9 1.2Need for study9 1.3Objectives10 1.4Scope10 1.5Methodology10 1.6Research Plan10 CHAPTER 2- LITERATURE REVIEW 2.1Introduction13 2.
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | CPM TH-0227 BHA | Not for loan | 012634 |
Total holds: 0
CONTENT CHAPTER 1- INTRODUCTION 1.1Introduction9 1.1.1 Risk assessment9 1.1.2 Failure Mode and Effect Analysis9 1.2Need for study9 1.3Objectives10 1.4Scope10 1.5Methodology10 1.6Research Plan10 CHAPTER 2- LITERATURE REVIEW 2.1Introduction13 2.
There are no comments on this title.
Log in to your account to post a comment.