Risk analysis of elevated corridor project using Failure Mode and Effect Analysis (FMEA) and combined fuzzy FMEA (Also available on CD) (Record no. 50805)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00779nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0227 |
Item number | BHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Bhavnani, Gunjan |
245 #0 - TITLE STATEMENT | |
Title | Risk analysis of elevated corridor project using Failure Mode and Effect Analysis (FMEA) and combined fuzzy FMEA (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2013 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 119p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENT CHAPTER 1- INTRODUCTION 1.1Introduction9 1.1.1 Risk assessment9 1.1.2 Failure Mode and Effect Analysis9 1.2Need for study9 1.3Objectives10 1.4Scope10 1.5Methodology10 1.6Research Plan10 CHAPTER 2- LITERATURE REVIEW 2.1Introduction13 2. |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sarkar, Debasis (Guide) |
891 ## - Topic | |
Topic | 2011 Batch |
891 ## - Topic | |
Topic | Construction and Planning Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 16/10/2014 | Faculty of Technology | CPM TH-0227 BHA | 012634 | 18/05/2018 | 18/05/2018 | Thesis |