Developing framework for BIM based construction projects through eliminating non-value adding activities (Softcopy is also available)
Material type: TextPublication details: 2021Description: xi,36pDDC classification:- CEM TH-0398 TRI
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | CEM TH-0398 TRI | Not For Loan | 023583 |
TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING i
CERTIFICATE iii
ABBREVIATIONS v
LIST OF FIGURES ix
LIST OF TABLES xi
CHAPTER-1: INTRODUCTION 1
CHAPTER-2: LITERATURE REVIEW 4
2.1 Research Positioning 8
CHAPTER-3: Research methodology 11
CHAPTER-4: data collection 14
4.1 Experience in BIM 14
4.2 Level of Agreement for NVA activities 14
4.3 Occurrence of Activities and Resulting Wastes 15
4.4 Impact on Productivity due to these NVAs 16
CHAPTER-5: data analysis and results 20
5.1 Quantitative Statistics 20
5.2 Inferential Statistics 21
5.2.1 T-test 1: On top 5 NVAs as obtained from Qs2 & Qs3 21
5.2.2 T-test 1: On all NVAs as obtained from Qs2 & Qs3 22
5.3 Criticality Factor 22
5.4 Results 24
5.4.1 Elimination of NVAs as Suggested by Subject Matter Experts 24
5.5 Data Validation 26
CHAPTER-6: Conclusions 28
REFERENCES 30
APPENDIX 32
There are no comments on this title.