Developing framework for BIM based construction projects through eliminating non-value adding activities (Softcopy is also available) (Record no. 69576)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01544nam a2200193Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 110101s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0398 |
Item number | TRI |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Tripathi, Sechika (PG190877) |
245 #0 - TITLE STATEMENT | |
Title | Developing framework for BIM based construction projects through eliminating non-value adding activities (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2021 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xi,36p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING i <br/>CERTIFICATE iii <br/>ABBREVIATIONS v <br/>LIST OF FIGURES ix <br/>LIST OF TABLES xi <br/>CHAPTER-1: INTRODUCTION 1 <br/>CHAPTER-2: LITERATURE REVIEW 4 <br/>2.1 Research Positioning 8 <br/>CHAPTER-3: Research methodology 11 <br/>CHAPTER-4: data collection 14 <br/>4.1 Experience in BIM 14 <br/>4.2 Level of Agreement for NVA activities 14 <br/>4.3 Occurrence of Activities and Resulting Wastes 15 <br/>4.4 Impact on Productivity due to these NVAs 16 <br/>CHAPTER-5: data analysis and results 20 <br/>5.1 Quantitative Statistics 20 <br/>5.2 Inferential Statistics 21 <br/>5.2.1 T-test 1: On top 5 NVAs as obtained from Qs2 & Qs3 21 <br/>5.2.2 T-test 1: On all NVAs as obtained from Qs2 & Qs3 22 <br/>5.3 Criticality Factor 22 <br/>5.4 Results 24 <br/>5.4.1 Elimination of NVAs as Suggested by Subject Matter Experts 24 <br/>5.5 Data Validation 26 <br/>CHAPTER-6: Conclusions 28 <br/>REFERENCES 30 <br/>APPENDIX 32<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Amarnath C.B. (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Trivedi, Jyoti (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2019 Batch |
891 ## - Topic | |
Topic | Construction Engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 27/04/2022 | Faculty of Technology | CEM TH-0398 TRI | 023583 | 27/04/2022 | 27/04/2022 | Thesis |