Image from Google Jackets

Evaluation of automated reinforcement fabrication process (Soft copy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2019Description: ii,59pDDC classification:
  • B TH-0805 PAT
Contents:
UNDERTAKING 3 APPROVAL 5 ACKNOWLEDGEMENT 7 ABSTRACT 9 INDEX OF TABLES 12 INDEX OF FIGURES 13 ABBREVIATIONS 14 CHAPTER - 1: INTRODUCTION 15 1.01 BACKGROUND 15 1.02 NEED FOR THE STUDY 15 1.03 SCOPE THE WORK 16 1.04 OBJECTIVES 16 1.05 RESEARCH METHODOLOGY 16 1.06 EXPECTED OUTCOME 17 1.07 RESEARCH SCHEDULE 17 CHAPTER - 2: LITERATURE STUDY 19 2.01 REINFORCEMENT FABRICATION PROCESS 19 2.01.01 On-Site Fabrication Process 19 2.01.02 Automated Fabrication Process 20 CHAPTER - 3: DATA COLLECTION 23 3.01 RESEARCH STRATEGY 23 3.01.01 Case Study Selection Criteria 23 3.02 CASE STUDY-1: ELECTROTHERM (INDIA) LTD. 24 3.02.01 Introduction 24 3.02.02 ET Cut & Bend Plant layout 25 3.02.03 Automated Cut and bend process 26 3.02.04 Equipment Details 27 3.02.05 Observations 29 3.02.06 Owning and Operating Cost 30 3.02.07 Rate Analysis 31 3.03 CASE STUDY - 2: SACHI STEEL SOLUTIONS PVT. LTD.- TATA TISCON READYBUILD 32 3.03.01 Introduction 32 3.03.02 TMT Cut & Bend Plant layout 33 3.03.03 Automated Cut and bend process 34 3.03.04 Equipment Details 35 3.03.05 Observations 37 3.03.06 Owning and Operating Cost of Equipment 38 3.03.07 Rate analysis 39 3.04 CASE STUDY - 3: SHALIGRAM SQUARE, AHMEDABAD 40 3.04.01 Introduction 40 3.04.02 On-site Reinforcement Yard Layout 40 3.04.03 On-site Reinforcement Fabrication Process 40 3.04.04 Equipment details 41 3.04.05 Observations 42 3.04.06 Owning and operating cost 43 3.04.07 Rate analysis 44 3.05 CASE STUDY - 3: SHAIVAL IMPERIA 45 3.05.01 Introduction 45 3.05.02 On-site Reinforcement Yard Layout 45 3.05.03 Reinforcement fabrication process On-site 46 3.05.04 Equipment Details 46 3.05.05 Observations 47 3.05.06 Owning and operating cost 48 3.05.07 Rate Analysis 49 CHAPTER - 4: ANALYSIS 51 4.01 Comparison 51 4.02 Impact on whole project if cut & bend rebars is used on-site 51 4.03 Inference 52 CHAPTER - 5: CONCLUSION 57 5.01 CONCLUSION 57 5.02 FUTURE SCOPE OF STUDY 58 References 59
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0805 PAT Not for loan 021331
Total holds: 0

UNDERTAKING 3
APPROVAL 5
ACKNOWLEDGEMENT 7
ABSTRACT 9
INDEX OF TABLES 12
INDEX OF FIGURES 13
ABBREVIATIONS 14
CHAPTER - 1: INTRODUCTION 15
1.01 BACKGROUND 15
1.02 NEED FOR THE STUDY 15
1.03 SCOPE THE WORK 16
1.04 OBJECTIVES 16
1.05 RESEARCH METHODOLOGY 16
1.06 EXPECTED OUTCOME 17
1.07 RESEARCH SCHEDULE 17
CHAPTER - 2: LITERATURE STUDY 19
2.01 REINFORCEMENT FABRICATION PROCESS 19
2.01.01 On-Site Fabrication Process 19
2.01.02 Automated Fabrication Process 20
CHAPTER - 3: DATA COLLECTION 23
3.01 RESEARCH STRATEGY 23
3.01.01 Case Study Selection Criteria 23
3.02 CASE STUDY-1: ELECTROTHERM (INDIA) LTD. 24
3.02.01 Introduction 24
3.02.02 ET Cut & Bend Plant layout 25
3.02.03 Automated Cut and bend process 26
3.02.04 Equipment Details 27
3.02.05 Observations 29
3.02.06 Owning and Operating Cost 30
3.02.07 Rate Analysis 31
3.03 CASE STUDY - 2: SACHI STEEL SOLUTIONS PVT. LTD.- TATA TISCON READYBUILD 32
3.03.01 Introduction 32
3.03.02 TMT Cut & Bend Plant layout 33
3.03.03 Automated Cut and bend process 34
3.03.04 Equipment Details 35
3.03.05 Observations 37
3.03.06 Owning and Operating Cost of Equipment 38
3.03.07 Rate analysis 39
3.04 CASE STUDY - 3: SHALIGRAM SQUARE, AHMEDABAD 40
3.04.01 Introduction 40
3.04.02 On-site Reinforcement Yard Layout 40
3.04.03 On-site Reinforcement Fabrication Process 40
3.04.04 Equipment details 41
3.04.05 Observations 42
3.04.06 Owning and operating cost 43
3.04.07 Rate analysis 44
3.05 CASE STUDY - 3: SHAIVAL IMPERIA 45
3.05.01 Introduction 45
3.05.02 On-site Reinforcement Yard Layout 45
3.05.03 Reinforcement fabrication process On-site 46
3.05.04 Equipment Details 46
3.05.05 Observations 47
3.05.06 Owning and operating cost 48
3.05.07 Rate Analysis 49
CHAPTER - 4: ANALYSIS 51
4.01 Comparison 51
4.02 Impact on whole project if cut & bend rebars is used on-site 51
4.03 Inference 52
CHAPTER - 5: CONCLUSION 57
5.01 CONCLUSION 57
5.02 FUTURE SCOPE OF STUDY 58
References 59

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials