Evaluation of automated reinforcement fabrication process (Soft copy is also available) (Record no. 56534)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02463nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 190808s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0805 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Ami Arvindkumar (UC3014) |
245 #0 - TITLE STATEMENT | |
Title | Evaluation of automated reinforcement fabrication process (Soft copy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2019 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ii,59p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | UNDERTAKING 3<br/>APPROVAL 5<br/>ACKNOWLEDGEMENT 7<br/>ABSTRACT 9<br/>INDEX OF TABLES 12<br/>INDEX OF FIGURES 13<br/>ABBREVIATIONS 14<br/>CHAPTER - 1: INTRODUCTION 15<br/>1.01 BACKGROUND 15<br/>1.02 NEED FOR THE STUDY 15<br/>1.03 SCOPE THE WORK 16<br/>1.04 OBJECTIVES 16<br/>1.05 RESEARCH METHODOLOGY 16<br/>1.06 EXPECTED OUTCOME 17<br/>1.07 RESEARCH SCHEDULE 17<br/>CHAPTER - 2: LITERATURE STUDY 19<br/>2.01 REINFORCEMENT FABRICATION PROCESS 19<br/>2.01.01 On-Site Fabrication Process 19<br/>2.01.02 Automated Fabrication Process 20<br/>CHAPTER - 3: DATA COLLECTION 23<br/>3.01 RESEARCH STRATEGY 23<br/>3.01.01 Case Study Selection Criteria 23<br/>3.02 CASE STUDY-1: ELECTROTHERM (INDIA) LTD. 24<br/>3.02.01 Introduction 24<br/>3.02.02 ET Cut & Bend Plant layout 25<br/>3.02.03 Automated Cut and bend process 26<br/>3.02.04 Equipment Details 27<br/>3.02.05 Observations 29<br/>3.02.06 Owning and Operating Cost 30<br/>3.02.07 Rate Analysis 31<br/>3.03 CASE STUDY - 2: SACHI STEEL SOLUTIONS PVT. LTD.- TATA TISCON READYBUILD 32<br/>3.03.01 Introduction 32<br/>3.03.02 TMT Cut & Bend Plant layout 33<br/>3.03.03 Automated Cut and bend process 34<br/>3.03.04 Equipment Details 35<br/>3.03.05 Observations 37<br/>3.03.06 Owning and Operating Cost of Equipment 38<br/>3.03.07 Rate analysis 39<br/>3.04 CASE STUDY - 3: SHALIGRAM SQUARE, AHMEDABAD 40<br/>3.04.01 Introduction 40<br/>3.04.02 On-site Reinforcement Yard Layout 40<br/>3.04.03 On-site Reinforcement Fabrication Process 40<br/>3.04.04 Equipment details 41<br/>3.04.05 Observations 42<br/>3.04.06 Owning and operating cost 43<br/>3.04.07 Rate analysis 44<br/>3.05 CASE STUDY - 3: SHAIVAL IMPERIA 45<br/>3.05.01 Introduction 45<br/>3.05.02 On-site Reinforcement Yard Layout 45<br/>3.05.03 Reinforcement fabrication process On-site 46<br/>3.05.04 Equipment Details 46<br/>3.05.05 Observations 47<br/>3.05.06 Owning and operating cost 48<br/>3.05.07 Rate Analysis 49<br/>CHAPTER - 4: ANALYSIS 51<br/>4.01 Comparison 51<br/>4.02 Impact on whole project if cut & bend rebars is used on-site 51<br/>4.03 Inference 52<br/>CHAPTER - 5: CONCLUSION 57<br/>5.01 CONCLUSION 57<br/>5.02 FUTURE SCOPE OF STUDY 58<br/>References 59 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Paresh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | FT-UG |
891 ## - Topic | |
Topic | 2014 Batch |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/08/2019 | Faculty of Technology | B TH-0805 PAT | 021331 | 08/08/2019 | 08/08/2019 | Thesis |