Image from Google Jackets

Energy assement guide for commercial buildings

By: Material type: TextTextSeries: USAID Eco -III projectPublication details: New Delhi USAID Eco-III Project 2008Description: viii,54pDDC classification:
  • 720.472 INT
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Notes Date due Barcode Item holds
Book CEPT Library BK 720.472 INT Available Comment:Prof. Rajan Rawal;Status:Catalogued 004491
Total holds: 0

CONTENTS : Executive Summary . 1 1. Introduction .. 2 1.1 Goals..2 1.2 Scope .3 1.2.1 Pre-Assessment..3 1.2.2 Assessment. .4 1.2.3 Post-Assessment .4 1.2.4 Additional Information.4 1.3 Status of Energy Assessment in India .4 1.3.1 Energy Assessment Drivers .. .4 1.3.2 Corporate Social Responsibility .5 1.4 Role of Key Organizations ..6 1.4.1 Strategies for a Successful Energy Assessment and Efficiency Program. . .6 2. Pre-Assessment . 9 2.1 Screening Tool . .9 2.2 Preliminary Data Collection .9 2.3 Energy Efficiency Committee .. 11 2.4 Self Evaluation . 11 2.5 Expression of Interest 12 2.6 Request For Proposal 13 2.6.1 Drafting the RFP14 2.6.2 Evaluating the RFP Responses . 15 3. Levels of Energy Assessments. .. .17 3.1 General information. 17 3.1.1 General Building and Energy Information17 3.1.2 Energy Using Systems . 17 3.1.3 Engineering and Financial Analysis. .. 18 3.2 Level I - Preliminary Energy Assessment. .. 19 3.3 Level II - Comprehensive Energy Assessment20 3.4 Level III - Detailed Analysis of Capital Intensive Measures . 21 3.4.1 Technical Analysis. 21 3.4.2 Financial Analysis 21 3.4.3 Risk Analysis22 3.5 Reporting Building Energy Assessment Results. 22 4. Post-Assessment .25 4.1 Implementation25 4.2 Performance Contracts 26 4.2.1 Important Components of a Performance Contract. 26 4.3 Operation and Maintenance. .. 27 4.4 Measurement and Verification. .. 28 4.5 Review 29 APPENDICES .30 Appendix A: State Designated Agencies . . 31 Appendix B: Standard Forms for Energy Assessment. 37 Appendix C: Guidelines on Preliminary Energy Use and Walk -Through Analysis - The eeBuildings Approach . 42 Appendix D: Annual Cooling Degree Hour and Day for Select Cities. .. 45 Appendix E: Model Response to RFP Outline for Commissioning Building Energy Assessment . 46 Appendix F: Guidelines to System Level Data Collection & Analysis 49 Appendix G: Guidelines on Energy Conservation Measures (ECMs) 51 Appendix H: Guidelines for Preparation of Energy Audit Report 52 Appendix I: References. 54

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials