Energy assement guide for commercial buildings (Record no. 9963)

MARC details
000 -LEADER
fixed length control field 02506nam a2200169Ia 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 720.472
Item number INT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name International Resources Group[IRG]
245 ## - TITLE STATEMENT
Title Energy assement guide for commercial buildings
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc. New Delhi
Name of publisher, distributor, etc. USAID Eco-III Project
Date of publication, distribution, etc. 2008
300 ## - PHYSICAL DESCRIPTION
Extent viii,54p.
440 ## - SERIES STATEMENT/ADDED ENTRY--TITLE
Title USAID Eco -III project
500 ## - GENERAL NOTE
General note CONTENTS : Executive Summary . 1 1. Introduction .. 2 1.1 Goals..2 1.2 Scope .3 1.2.1 Pre-Assessment..3 1.2.2 Assessment. .4 1.2.3 Post-Assessment .4 1.2.4 Additional Information.4 1.3 Status of Energy Assessment in India .4 1.3.1 Energy Assessment Drivers .. .4 1.3.2 Corporate Social Responsibility .5 1.4 Role of Key Organizations ..6 1.4.1 Strategies for a Successful Energy Assessment and Efficiency Program. . .6 2. Pre-Assessment . 9 2.1 Screening Tool . .9 2.2 Preliminary Data Collection .9 2.3 Energy Efficiency Committee .. 11 2.4 Self Evaluation . 11 2.5 Expression of Interest 12 2.6 Request For Proposal 13 2.6.1 Drafting the RFP14 2.6.2 Evaluating the RFP Responses . 15 3. Levels of Energy Assessments. .. .17 3.1 General information. 17 3.1.1 General Building and Energy Information17 3.1.2 Energy Using Systems . 17 3.1.3 Engineering and Financial Analysis. .. 18 3.2 Level I - Preliminary Energy Assessment. .. 19 3.3 Level II - Comprehensive Energy Assessment20 3.4 Level III - Detailed Analysis of Capital Intensive Measures . 21 3.4.1 Technical Analysis. 21 3.4.2 Financial Analysis 21 3.4.3 Risk Analysis22 3.5 Reporting Building Energy Assessment Results. 22 4. Post-Assessment .25 4.1 Implementation25 4.2 Performance Contracts 26 4.2.1 Important Components of a Performance Contract. 26 4.3 Operation and Maintenance. .. 27 4.4 Measurement and Verification. .. 28 4.5 Review 29 APPENDICES .30 Appendix A: State Designated Agencies . . 31 Appendix B: Standard Forms for Energy Assessment. 37 Appendix C: Guidelines on Preliminary Energy Use and Walk -Through Analysis - The eeBuildings Approach . 42 Appendix D: Annual Cooling Degree Hour and Day for Select Cities. .. 45 Appendix E: Model Response to RFP Outline for Commissioning Building Energy Assessment . 46 Appendix F: Guidelines to System Level Data Collection & Analysis 49 Appendix G: Guidelines on Energy Conservation Measures (ECMs) 51 Appendix H: Guidelines for Preparation of Energy Audit Report 52 Appendix I: References. 54
890 ## - COUNTRY
-- India
891 ## - TOPIC
-- GRATIS
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Home library Current library Date acquired Total Checkouts Total Renewals Full call number Barcode Date last seen Date checked out Price effective from Koha item type Public note
          CEPT Library CEPT Library 11/11/2008 9 11 720.472 INT 004491 12/03/2019 31/12/2018 30/08/2013 Book Comment:Prof. Rajan Rawal;Status:Catalogued
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials