Energy assement guide for commercial buildings (Record no. 9963)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02506nam a2200169Ia 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 720.472 |
Item number | INT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | International Resources Group[IRG] |
245 ## - TITLE STATEMENT | |
Title | Energy assement guide for commercial buildings |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Place of publication, distribution, etc. | New Delhi |
Name of publisher, distributor, etc. | USAID Eco-III Project |
Date of publication, distribution, etc. | 2008 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | viii,54p. |
440 ## - SERIES STATEMENT/ADDED ENTRY--TITLE | |
Title | USAID Eco -III project |
500 ## - GENERAL NOTE | |
General note | CONTENTS : Executive Summary . 1 1. Introduction .. 2 1.1 Goals..2 1.2 Scope .3 1.2.1 Pre-Assessment..3 1.2.2 Assessment. .4 1.2.3 Post-Assessment .4 1.2.4 Additional Information.4 1.3 Status of Energy Assessment in India .4 1.3.1 Energy Assessment Drivers .. .4 1.3.2 Corporate Social Responsibility .5 1.4 Role of Key Organizations ..6 1.4.1 Strategies for a Successful Energy Assessment and Efficiency Program. . .6 2. Pre-Assessment . 9 2.1 Screening Tool . .9 2.2 Preliminary Data Collection .9 2.3 Energy Efficiency Committee .. 11 2.4 Self Evaluation . 11 2.5 Expression of Interest 12 2.6 Request For Proposal 13 2.6.1 Drafting the RFP14 2.6.2 Evaluating the RFP Responses . 15 3. Levels of Energy Assessments. .. .17 3.1 General information. 17 3.1.1 General Building and Energy Information17 3.1.2 Energy Using Systems . 17 3.1.3 Engineering and Financial Analysis. .. 18 3.2 Level I - Preliminary Energy Assessment. .. 19 3.3 Level II - Comprehensive Energy Assessment20 3.4 Level III - Detailed Analysis of Capital Intensive Measures . 21 3.4.1 Technical Analysis. 21 3.4.2 Financial Analysis 21 3.4.3 Risk Analysis22 3.5 Reporting Building Energy Assessment Results. 22 4. Post-Assessment .25 4.1 Implementation25 4.2 Performance Contracts 26 4.2.1 Important Components of a Performance Contract. 26 4.3 Operation and Maintenance. .. 27 4.4 Measurement and Verification. .. 28 4.5 Review 29 APPENDICES .30 Appendix A: State Designated Agencies . . 31 Appendix B: Standard Forms for Energy Assessment. 37 Appendix C: Guidelines on Preliminary Energy Use and Walk -Through Analysis - The eeBuildings Approach . 42 Appendix D: Annual Cooling Degree Hour and Day for Select Cities. .. 45 Appendix E: Model Response to RFP Outline for Commissioning Building Energy Assessment . 46 Appendix F: Guidelines to System Level Data Collection & Analysis 49 Appendix G: Guidelines on Energy Conservation Measures (ECMs) 51 Appendix H: Guidelines for Preparation of Energy Audit Report 52 Appendix I: References. 54 |
890 ## - COUNTRY | |
-- | India |
891 ## - TOPIC | |
-- | GRATIS |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Home library | Current library | Date acquired | Total Checkouts | Total Renewals | Full call number | Barcode | Date last seen | Date checked out | Price effective from | Koha item type | Public note |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CEPT Library | CEPT Library | 11/11/2008 | 9 | 11 | 720.472 INT | 004491 | 12/03/2019 | 31/12/2018 | 30/08/2013 | Book | Comment:Prof. Rajan Rawal;Status:Catalogued |