Digitization of QAQC to get authentic project quality rating of industrial project (Softcopy is also available)
Material type: TextPublication details: 2024Description: xviii,106pDDC classification:- B TH-1060 SOM
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library Processing Center | Faculty of Technology | B TH-1060 SOM | Not For Loan | 026790 |
Table Of Contents
Abstract I
Undertaking Iii
Certificate V
Acknowledgments Vii
Abbreviations Ix
Table Of Contents Xi
List Of Figures Xv
List Of Tables Xvii
Chapter-1: Introduction 1
1.1 Scenario Of Qaqc In The Indian Construction Industry: 1
1.2 Digitization Of Qaqc And Project Quality Rating: 2
1.3 Challenges And Considerations: 3
Chapter-2: Research Objectives 5
2.1 Aim 5
2.2 Objective 5
2.3 Scope Of Work 5
2.4 Need Of Study 6
Chapter-3: Literature Review 7
3.1 Relative Importance Index Method (Rii) 7
3.2 Key Performance Indicators 8
3.3 Fuzzy Assessment Model 8
Chapter-4: Research Methodology 11
4.1 Literature Review 11
4.2 Data Analysis 11
4.3 Data Validation 11
Chapter-5: Standard Qaqc Procedures 15
5.1 Procedure For Checking Any Activity: 15
5.2 Material Testing Procedures: 15
5.3 List Of Standard Forms (Quality): 16
5.4 Roles And Responsibilities 16
Chapter-6: Case Studies 19
6.1 Case Studies With An Existing Quality Framework On Site 19
6.1.1 Site 1: Nestle Plant- Phase 3 20
6.1.2 Site 2: Torrent Osd 25
6.1.3 Site 3: Kazima Industrial Plant 29
6.1.4 Site 4: Meta Strip Industries 35
6.1.5 Site 5: Aquestia 39
6.2 Case Studies With No Existing Quality Framework On Site 43
6.2.1 Site 6: Agni Electrical 44
6.2.2 Site 7: Takshashila Industrials 48
6.2.3 Site 8: Suryoday Intermediates 52
6.2.4 Site 9: Shreeji Earth Movers 57
6.2.5 Site 10: Brahmani Electrical 61
6.1 Summary 65
Chapter-7: Quality Rating System 67
Chapter-8: Digital Quality Rating System Framework 69
8.1 Introduction: 69
8.2 How It Works? 70
8.2.1 Defining Values 70
8.2.2 Calculation Percentage 70
8.2.3 Setting Criteria Based On Percentage 70
8.3 Standard Operating Procedure For Implementation 71
8.4 Sample: 71
8.4.1 Excavation: 72
8.4.2 Structural Steel 73
8.4.3 Gp2 Grouting 74
8.4.4 Formwork 75
8.4.5 Reinforcement: 76
8.4.6 Concreting: 77
8.4.7 Brickwork: 79
8.4.8 Plastering: 80
8.5 Percentage-Wise Quality Achieved For The Project 81
8.6 Validation Of Framework 82
8.6.1 Reviews From Construction Industry Stakeholders 82
Chapter-9: Conclusion 85
9.1 Future Scope 86
Bibliography 87
Appendix 89