Impact of Covid-19 Pandemic on constuction projects (Softcopy is also Available)

By: Contributor(s): Material type: TextTextPublication details: 2020Description: x,54pDDC classification:
  • B TH-0950  CHA
Contents:
Table of Contents Declaration I List of tables V List of figures VII Acknowledgments IX Abstract X 1. Introduction. 1 1.1 Background 1 1.2 Need for study 1 1.3 Objective of study 2 1.4 Scope of the work 2 1.5 Research methodology 2 1.5.1 Literature Review 2 1.5.2 Data collection method 3 1.5.3 Data Analysis 5 1.5.4 Inferences and conclusions 6 1.6 Research time-line 6 2 Literature Review 7 2.1 Delays in construction projects 7 2.1.1 Types of delays 7 2.2 Cost overruns in construction projects 10 2.2.1 Types of cost overruns 10 2.3 Factors of Time and Cost Overruns 12 2.3 COVID-19 Enters 14 2.3.1 Impact of COVID-19 globally 14 2.3.2 Impact of COVID-19 on India 14 2.3.3 Impact of COVID-19 on the Indian Construction Industry 15 3 Data collection 18 3.1Questionnaire 18 3.2 case study 1 21 3.2.1 Important Points of force majeure clause 21 3.2.4 Delay due to lockdown 23 3.2.3 claim done by the contractor 23 3.3 Case study -2 24 3.3.3 Delay due to lockdown 24 3.3.2 Claim done by contractor 26 3.4 Case study -3 27 3.4.1 Force Majeure 27 3.4.2 Delay due to lockdown 29 3.5 case study 4 30 3.5.1 Force Majeure 30 3.5.3 Delay due to lockdown 31 4 Data analysis 32 4.1 Questionnaire analysis 32 4.1.1Relative Importance Index 32 4.2 case study 1 34 4.3 case study 2 35 4.4 case study 3 36 4.5 case study 4 37 5 conclusion 39 6 Recommendation 40 7 Bibliography 41 8 Annexure 42 8.1 Questionnaire 42 8.1.1 section 1 42 8.1.2 section 2 43 8.1.3 section 3 46 8.2 Questionnaire survey responses 51
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0950 CHA Not For Loan 023984
Total holds: 0

Table of Contents
Declaration I
List of tables V
List of figures VII
Acknowledgments IX
Abstract X
1. Introduction. 1
1.1 Background 1
1.2 Need for study 1
1.3 Objective of study 2
1.4 Scope of the work 2
1.5 Research methodology 2
1.5.1 Literature Review 2
1.5.2 Data collection method 3
1.5.3 Data Analysis 5
1.5.4 Inferences and conclusions 6
1.6 Research time-line 6
2 Literature Review 7
2.1 Delays in construction projects 7
2.1.1 Types of delays 7
2.2 Cost overruns in construction projects 10
2.2.1 Types of cost overruns 10
2.3 Factors of Time and Cost Overruns 12
2.3 COVID-19 Enters 14
2.3.1 Impact of COVID-19 globally 14
2.3.2 Impact of COVID-19 on India 14
2.3.3 Impact of COVID-19 on the Indian Construction Industry 15
3 Data collection 18
3.1Questionnaire 18
3.2 case study 1 21
3.2.1 Important Points of force majeure clause 21
3.2.4 Delay due to lockdown 23
3.2.3 claim done by the contractor 23
3.3 Case study -2 24
3.3.3 Delay due to lockdown 24
3.3.2 Claim done by contractor 26
3.4 Case study -3 27
3.4.1 Force Majeure 27
3.4.2 Delay due to lockdown 29
3.5 case study 4 30
3.5.1 Force Majeure 30
3.5.3 Delay due to lockdown 31
4 Data analysis 32
4.1 Questionnaire analysis 32
4.1.1Relative Importance Index 32
4.2 case study 1 34
4.3 case study 2 35
4.4 case study 3 36
4.5 case study 4 37
5 conclusion 39
6 Recommendation 40
7 Bibliography 41
8 Annexure 42
8.1 Questionnaire 42
8.1.1 section 1 42
8.1.2 section 2 43
8.1.3 section 3 46
8.2 Questionnaire survey responses 51

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials