Impact of Covid-19 Pandemic on constuction projects (Softcopy is also Available) (Record no. 69862)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02069nam a22001577a 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0950 |
Item number | CHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Chaudhary, Ankit (UC0415) |
245 ## - TITLE STATEMENT | |
Title | Impact of Covid-19 Pandemic on constuction projects (Softcopy is also Available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2020 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | x,54p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Table of Contents<br/>Declaration I<br/>List of tables V<br/>List of figures VII<br/>Acknowledgments IX<br/>Abstract X<br/>1. Introduction. 1<br/>1.1 Background 1<br/>1.2 Need for study 1<br/>1.3 Objective of study 2<br/>1.4 Scope of the work 2<br/>1.5 Research methodology 2<br/>1.5.1 Literature Review 2<br/>1.5.2 Data collection method 3<br/>1.5.3 Data Analysis 5<br/>1.5.4 Inferences and conclusions 6<br/>1.6 Research time-line 6<br/>2 Literature Review 7<br/>2.1 Delays in construction projects 7<br/>2.1.1 Types of delays 7<br/>2.2 Cost overruns in construction projects 10<br/>2.2.1 Types of cost overruns 10<br/>2.3 Factors of Time and Cost Overruns 12<br/>2.3 COVID-19 Enters 14<br/>2.3.1 Impact of COVID-19 globally 14<br/>2.3.2 Impact of COVID-19 on India 14<br/>2.3.3 Impact of COVID-19 on the Indian Construction Industry 15<br/>3 Data collection 18<br/>3.1Questionnaire 18<br/>3.2 case study 1 21<br/>3.2.1 Important Points of force majeure clause 21<br/>3.2.4 Delay due to lockdown 23<br/>3.2.3 claim done by the contractor 23<br/>3.3 Case study -2 24 <br/>3.3.3 Delay due to lockdown 24<br/>3.3.2 Claim done by contractor 26<br/>3.4 Case study -3 27<br/>3.4.1 Force Majeure 27<br/>3.4.2 Delay due to lockdown 29<br/>3.5 case study 4 30<br/>3.5.1 Force Majeure 30<br/>3.5.3 Delay due to lockdown 31<br/>4 Data analysis 32<br/>4.1 Questionnaire analysis 32<br/>4.1.1Relative Importance Index 32<br/>4.2 case study 1 34<br/>4.3 case study 2 35<br/>4.4 case study 3 36<br/>4.5 case study 4 37<br/>5 conclusion 39<br/>6 Recommendation 40<br/>7 Bibliography 41<br/>8 Annexure 42<br/>8.1 Questionnaire 42<br/>8.1.1 section 1 42<br/>8.1.2 section 2 43<br/>8.1.3 section 3 46<br/>8.2 Questionnaire survey responses 51<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Tewar, Bhargav (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | FT-UG |
891 ## - Topic | |
Topic | 2015 Batch |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 20/07/2022 | Faculty of Technology | B TH-0950 CHA | 023984 | 20/07/2022 | 20/07/2022 | Thesis |