Impact of heuristic approach and project scheduling approach on the financial and time aspects of a residential project (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2020-21Description: viii,54pDDC classification:
  • B TH-0933 VOR
Contents:
INDEX 1 INTRODUCTION 6 1.1 Need for the study 7 1.2 Objective 7 1.3 Scope of the work 7 1.4 Limitations: 7 1.5 Research gap 8 1.6 Research framework 8 1.7 Research timeline 9 2 LITERATURE REVIEW 10 3 RESEARCH METHODOLOGY 14 3.1 Case study details 14 3.2 Project scheduling of Tower-A 15 3.3 Heuristic approach for Tower-A 16 3.4 Project scheduling for Tower-B 20 3.5 Heuristic approach for Tower-B 21 3.6 Material Rates 23 3.6.1 Reinforcement Materials 23 3.6.2 Concrete Materials 23 3.6.3 Formwork Materials 23 3.7 Analysis of reinforcement material for tower-A 24 3.8 Analysis of concrete material for Tower-A 25 3.9 Analysis of reinforcement material for Tower-B 26 3.10 Analysis of concrete material for Tower-B 27 3.11 Analysis of formwork material 28 3.12 Analysis of column formwork 30 3.13 Labour analysis by Project scheduling 31 3.14 Labour Analysis by heuristic Aapproach 33 3.15 Finance cost of steel 36 3.16 Finance Cost of Cement Bags 37 3.17 Comparison of Cost between Project Scheduling and Heuristic Approach 40 3.18 Material Scheduling and Planning 41 3.19 Labour Matrix (Heuristic) 42 4 CONCLUSION 46 4.1 Future Scope 46 5 BIBLOGRAPHY 47 6 ANNEXURE 48 6.1 Supplier’s name 48 6.2 Tower-A floor plan 49 6.3 Tower-B foundation plan 50 6.4 Labour analysis for Tower-B (Project scheduling) 51 6.5 Labour analysis for Tower-B (Heuristic approach) 52
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0933 VOR Not For Loan 023675
Total holds: 0

INDEX
1 INTRODUCTION 6
1.1 Need for the study 7
1.2 Objective 7
1.3 Scope of the work 7
1.4 Limitations: 7
1.5 Research gap 8
1.6 Research framework 8
1.7 Research timeline 9
2 LITERATURE REVIEW 10
3 RESEARCH METHODOLOGY 14
3.1 Case study details 14
3.2 Project scheduling of Tower-A 15
3.3 Heuristic approach for Tower-A 16
3.4 Project scheduling for Tower-B 20
3.5 Heuristic approach for Tower-B 21
3.6 Material Rates 23
3.6.1 Reinforcement Materials 23
3.6.2 Concrete Materials 23
3.6.3 Formwork Materials 23
3.7 Analysis of reinforcement material for tower-A 24
3.8 Analysis of concrete material for Tower-A 25
3.9 Analysis of reinforcement material for Tower-B 26
3.10 Analysis of concrete material for Tower-B 27
3.11 Analysis of formwork material 28
3.12 Analysis of column formwork 30
3.13 Labour analysis by Project scheduling 31
3.14 Labour Analysis by heuristic Aapproach 33
3.15 Finance cost of steel 36
3.16 Finance Cost of Cement Bags 37
3.17 Comparison of Cost between Project Scheduling and Heuristic Approach 40
3.18 Material Scheduling and Planning 41
3.19 Labour Matrix (Heuristic) 42
4 CONCLUSION 46
4.1 Future Scope 46
5 BIBLOGRAPHY 47
6 ANNEXURE 48
6.1 Supplier’s name 48
6.2 Tower-A floor plan 49
6.3 Tower-B foundation plan 50
6.4 Labour analysis for Tower-B (Project scheduling) 51
6.5 Labour analysis for Tower-B (Heuristic approach) 52

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials