Impact of heuristic approach and project scheduling approach on the financial and time aspects of a residential project (Softcopy is also available) (Record no. 69697)

MARC details
000 -LEADER
fixed length control field 02065nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110102s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0933
Item number VOR
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Vora, Abhishek (UC8516)
245 #0 - TITLE STATEMENT
Title Impact of heuristic approach and project scheduling approach on the financial and time aspects of a residential project (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2020-21
300 ## - PHYSICAL DESCRIPTION
Extent viii,54p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note INDEX <br/>1 INTRODUCTION 6 <br/>1.1 Need for the study 7 <br/>1.2 Objective 7 <br/>1.3 Scope of the work 7 <br/>1.4 Limitations: 7 <br/>1.5 Research gap 8 <br/>1.6 Research framework 8 <br/>1.7 Research timeline 9 <br/>2 LITERATURE REVIEW 10 <br/>3 RESEARCH METHODOLOGY 14 <br/>3.1 Case study details 14 <br/>3.2 Project scheduling of Tower-A 15 <br/>3.3 Heuristic approach for Tower-A 16 <br/>3.4 Project scheduling for Tower-B 20 <br/>3.5 Heuristic approach for Tower-B 21 <br/>3.6 Material Rates 23 <br/>3.6.1 Reinforcement Materials 23 <br/>3.6.2 Concrete Materials 23 <br/>3.6.3 Formwork Materials 23 <br/>3.7 Analysis of reinforcement material for tower-A 24 <br/>3.8 Analysis of concrete material for Tower-A 25 <br/>3.9 Analysis of reinforcement material for Tower-B 26 <br/>3.10 Analysis of concrete material for Tower-B 27 <br/>3.11 Analysis of formwork material 28 <br/>3.12 Analysis of column formwork 30 <br/>3.13 Labour analysis by Project scheduling 31 <br/>3.14 Labour Analysis by heuristic Aapproach 33 <br/>3.15 Finance cost of steel 36 <br/>3.16 Finance Cost of Cement Bags 37 <br/>3.17 Comparison of Cost between Project Scheduling and Heuristic Approach 40 <br/>3.18 Material Scheduling and Planning 41 <br/>3.19 Labour Matrix (Heuristic) 42 <br/>4 CONCLUSION 46 <br/>4.1 Future Scope 46 <br/>5 BIBLOGRAPHY 47 <br/>6 ANNEXURE 48 <br/>6.1 Supplier’s name 48 <br/>6.2 Tower-A floor plan 49 <br/>6.3 Tower-B foundation plan 50 <br/>6.4 Labour analysis for Tower-B (Project scheduling) 51 <br/>6.5 Labour analysis for Tower-B (Heuristic approach) 52 <br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Bakeri, Pavan (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2016 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library 17/05/2022 Faculty of Technology B TH-0933 VOR 023675 17/05/2022 17/05/2022 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials