Image from Google Jackets

Identification of critical factors affecting extention of time in construction projects (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: xi,66pDDC classification:
  • CPM TH-0308 CHO
Contents:
Contents List of Tables vii List of Figures viii Acknowledgement x Abstract xi Chapter 1: Introduction 1 1.1 Work Outline 1 1.2 Need of Study 2 Chapter 2: Research Design 3 2.1 Objective of Study 3 2.2 Scope of Study 3 2.3 Proposed Methodology 3 2.3.1 Literature Review 4 2.3.2 Data Collection & Analysis 4 2.3.3 Regression model 4 2.4 Thesis Schedule 4 Chapter 3: Literature Review 5 3.1 Construction delay 5 3.1.1 Types of Delay 5 3.2 Literature review summery of delay factors 7 3.3 Extension of Time 8 3.3.1 Contract Provision for Extension of Time 8 3.4 Procedures for Claiming an Extension of Time15 3.5 Resampling 16 3.5.1 Bootstrap Resampling 17 3.6 Earned value concept 17 3.6.1 Performance Indicators 18 3.7 Literature Review Table 19 3.8 Research Gap 26 Chapter 4: Data Collection 27 4.1 Factors affecting Extension of time. 27 4.2 Description of Probability and Impact ratings 28 4.3 Questionnaire Sample 28 4.3.1 Probability and Impact distribution of factors 34 4.4 Projects Undertaken for Study 35 4.4.1 Case study 01 –36 4.4.2 Planned Vs earned progress data 36 4.4.3 Schedule delay due to critical factors. 37 4.5 Case study 02 38 4.5.1 Project Detail 38 4.5.2 Planned Vs earned progress data 38 4.5.3 Schedule delay due to critical factors 38 4.6 Case study 03 40 4.6.1 Project Detail 40 4.6.2 Planned Vs Earned progress data 40 4.6.3 Schedule delay due to critical factors 41 4.7 Regression Analysis Input Table 42 Chapter 5: Data Analysis 45 5.1 Bootstrap Technique 45 5.2 Bootstrap BCA using Excel Add-in -Resampling Stats 46 5.3 Confidence Intervals for Probability and Impact 48 5.4 Interval Score and Final Ranking 49 5.5 Critical Factors affecting Extension of time. 51 5.6 Earned Schedule 51 5.7 Regression Analysis. 53 5.7.1 Multiple Regression Model for ES determination. 54 5.7.2 Model Constraints 56 5.7.3 Model Validation 57 Chapter: 6 Conclusion and future scope 59 6.1 Conclusion 59 6.2 Limitations 59 6.3 Future Scope 60 Bibliography 61 Annexure 62
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0308 CHO Not for loan 019990
Total holds: 0

Contents
List of Tables vii
List of Figures viii
Acknowledgement x
Abstract xi
Chapter 1: Introduction 1
1.1 Work Outline 1
1.2 Need of Study 2
Chapter 2: Research Design 3
2.1 Objective of Study 3
2.2 Scope of Study 3
2.3 Proposed Methodology 3
2.3.1 Literature Review 4
2.3.2 Data Collection & Analysis 4
2.3.3 Regression model 4
2.4 Thesis Schedule 4
Chapter 3: Literature Review 5
3.1 Construction delay 5
3.1.1 Types of Delay 5
3.2 Literature review summery of delay factors 7
3.3 Extension of Time 8
3.3.1 Contract Provision for Extension of Time 8
3.4 Procedures for Claiming an Extension of Time15
3.5 Resampling 16
3.5.1 Bootstrap Resampling 17
3.6 Earned value concept 17
3.6.1 Performance Indicators 18
3.7 Literature Review Table 19
3.8 Research Gap 26
Chapter 4: Data Collection 27
4.1 Factors affecting Extension of time. 27
4.2 Description of Probability and Impact ratings 28
4.3 Questionnaire Sample 28
4.3.1 Probability and Impact distribution of factors 34
4.4 Projects Undertaken for Study 35
4.4.1 Case study 01 –36
4.4.2 Planned Vs earned progress data 36
4.4.3 Schedule delay due to critical factors. 37
4.5 Case study 02 38
4.5.1 Project Detail 38
4.5.2 Planned Vs earned progress data 38
4.5.3 Schedule delay due to critical factors 38
4.6 Case study 03 40
4.6.1 Project Detail 40
4.6.2 Planned Vs Earned progress data 40
4.6.3 Schedule delay due to critical factors 41
4.7 Regression Analysis Input Table 42
Chapter 5: Data Analysis 45
5.1 Bootstrap Technique 45
5.2 Bootstrap BCA using Excel Add-in -Resampling Stats 46
5.3 Confidence Intervals for Probability and Impact 48
5.4 Interval Score and Final Ranking 49
5.5 Critical Factors affecting Extension of time. 51
5.6 Earned Schedule 51
5.7 Regression Analysis. 53
5.7.1 Multiple Regression Model for ES determination. 54
5.7.2 Model Constraints 56
5.7.3 Model Validation 57
Chapter: 6 Conclusion and future scope 59
6.1 Conclusion 59
6.2 Limitations 59
6.3 Future Scope 60
Bibliography 61
Annexure 62

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials