Identification of critical factors affecting extention of time in construction projects (Softcopy is also available) (Record no. 55123)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02609nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0308 |
Item number | CHO |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Choksi, Vashishtha (PT100516) |
245 #0 - TITLE STATEMENT | |
Title | Identification of critical factors affecting extention of time in construction projects (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xi,66p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>List of Tables vii<br/>List of Figures viii<br/>Acknowledgement x<br/>Abstract xi<br/>Chapter 1: Introduction 1<br/>1.1 Work Outline 1<br/>1.2 Need of Study 2<br/>Chapter 2: Research Design 3<br/>2.1 Objective of Study 3<br/>2.2 Scope of Study 3<br/>2.3 Proposed Methodology 3<br/>2.3.1 Literature Review 4<br/>2.3.2 Data Collection & Analysis 4<br/>2.3.3 Regression model 4<br/>2.4 Thesis Schedule 4<br/>Chapter 3: Literature Review 5<br/>3.1 Construction delay 5<br/>3.1.1 Types of Delay 5<br/>3.2 Literature review summery of delay factors 7<br/>3.3 Extension of Time 8<br/>3.3.1 Contract Provision for Extension of Time 8<br/>3.4 Procedures for Claiming an Extension of Time15<br/>3.5 Resampling 16<br/>3.5.1 Bootstrap Resampling 17<br/>3.6 Earned value concept 17<br/>3.6.1 Performance Indicators 18<br/>3.7 Literature Review Table 19<br/>3.8 Research Gap 26<br/>Chapter 4: Data Collection 27<br/>4.1 Factors affecting Extension of time. 27<br/>4.2 Description of Probability and Impact ratings 28<br/>4.3 Questionnaire Sample 28<br/>4.3.1 Probability and Impact distribution of factors 34<br/>4.4 Projects Undertaken for Study 35<br/>4.4.1 Case study 01 –36<br/>4.4.2 Planned Vs earned progress data 36<br/>4.4.3 Schedule delay due to critical factors. 37<br/>4.5 Case study 02 38<br/>4.5.1 Project Detail 38<br/>4.5.2 Planned Vs earned progress data 38<br/>4.5.3 Schedule delay due to critical factors 38<br/>4.6 Case study 03 40<br/>4.6.1 Project Detail 40<br/>4.6.2 Planned Vs Earned progress data 40<br/>4.6.3 Schedule delay due to critical factors 41<br/>4.7 Regression Analysis Input Table 42<br/>Chapter 5: Data Analysis 45<br/>5.1 Bootstrap Technique 45<br/>5.2 Bootstrap BCA using Excel Add-in -Resampling Stats 46<br/>5.3 Confidence Intervals for Probability and Impact 48<br/>5.4 Interval Score and Final Ranking 49<br/>5.5 Critical Factors affecting Extension of time. 51<br/>5.6 Earned Schedule 51<br/>5.7 Regression Analysis. 53<br/>5.7.1 Multiple Regression Model for ES determination. 54<br/>5.7.2 Model Constraints 56<br/>5.7.3 Model Validation 57<br/>Chapter: 6 Conclusion and future scope 59<br/>6.1 Conclusion 59<br/>6.2 Limitations 59<br/>6.3 Future Scope 60<br/>Bibliography 61<br/>Annexure 62 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Trivedi, Jyoti (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0308 CHO | 019990 | 08/09/2018 | 08/09/2018 | Thesis |