Contents:
CONTENTS 1.0 INTRODUCTION 1 1.01 Background 1 1.02 Project Delivery and Procurement Methods & Contract Format 1 1.03 From Contracting to EPC 2 1.04 Opportunity in EPC in India 2 1.04 Need for study 3 1.05 Aim of study 3 1.06 Objectives of Study 3 1.07 Scope of work 4 1.08 Limitations 4 1.09 Time Frame 4 2.0 LITERATURE REVIEW 5 2.01 Overview of EPC Contract 5 2.02 Overview of Bidding Strategy 5 2.03 Unviable bidding 6 2.04 Competitive Bidding 6 2.05 Bidding Strategy 6 2.05.01 Lowest Bidding Strategy 6 2.05.02 Average Bidding 7 2.05.03 Game Theory Approach for Bidding 7 2.05.04 A+B Method of Bidding 8 2.06 Bidding Models 8 2.07 Critical factors affecting the bidding strategy 9 2.08 Mark-up estimation reference model 11 2.09 Summary of Literature Review 12 2.10 Findings from the Literature Review 13 2.11 Research Gap 13 3.0 RESEARCH METHODOLOGY 14 3.0.1 Research Design 14 4.0 DATA COLLECTION 16 4.01 Data Collection Methodology 16 4.02 Groups of factors for EPC contract 16 4.03 Identified factors 17 4.04 Data Collection for Factor Analysis 18 4.04.01 Pilot Survey 18 4.04.02 Questionnaire Design 19 4.04.03 Sampling 19 4.05 Data of Respondents 20 4.05.01 Experience in Industry 21 4.06 Data Collection for designing of bid strategy 22 4.07 Bid cost calculation 22 4.07.01 Determining Bid Price 22 4.07.02 Computing Bid Price 23 4.08 Case study selection criteria 25 4.09 Case Study 25 5.0 DATA ANALYSIS 26 5.01 Overview of Data Analysis 26 5.02 Methodology of Analysis 26 5.03 Ranking the factors affecting the bid strategy for EPC Contract 26 5.03.01 Test of soundness of data 26 5.03.02 Data analysis by RII method 28 5.04 Impact of factors on bidding strategy . 34 5.04 Regression Analysis for Estimation Equation 35 5.04.01 Factors affecting the cost of project (ESR) in the planning phase: 36 5.04.02 Regression Analysis – Model -1 37 5.04.03 Regression Analysis – Model -2 38 6.0 CONCLUSION & FUTURE SCOPE 39 6.01 Conclusion 39 6.02 Future Scope 39 7.0 REFERENCES 40 8.0 ANNEXURE 42 8.01 Questionnaire Survey Form 42 8.02 List of companies 48
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0752 PAT Not for loan 019809
Total holds: 0

CONTENTS
1.0 INTRODUCTION 1
1.01 Background 1
1.02 Project Delivery and Procurement Methods & Contract Format 1
1.03 From Contracting to EPC 2
1.04 Opportunity in EPC in India 2
1.04 Need for study 3
1.05 Aim of study 3
1.06 Objectives of Study 3
1.07 Scope of work 4
1.08 Limitations 4
1.09 Time Frame 4
2.0 LITERATURE REVIEW 5
2.01 Overview of EPC Contract 5
2.02 Overview of Bidding Strategy 5
2.03 Unviable bidding 6
2.04 Competitive Bidding 6
2.05 Bidding Strategy 6
2.05.01 Lowest Bidding Strategy 6
2.05.02 Average Bidding 7
2.05.03 Game Theory Approach for Bidding 7
2.05.04 A+B Method of Bidding 8
2.06 Bidding Models 8
2.07 Critical factors affecting the bidding strategy 9
2.08 Mark-up estimation reference model 11
2.09 Summary of Literature Review 12
2.10 Findings from the Literature Review 13
2.11 Research Gap 13
3.0 RESEARCH METHODOLOGY 14
3.0.1 Research Design 14
4.0 DATA COLLECTION 16
4.01 Data Collection Methodology 16
4.02 Groups of factors for EPC contract 16
4.03 Identified factors 17
4.04 Data Collection for Factor Analysis 18
4.04.01 Pilot Survey 18
4.04.02 Questionnaire Design 19
4.04.03 Sampling 19
4.05 Data of Respondents 20
4.05.01 Experience in Industry 21
4.06 Data Collection for designing of bid strategy 22
4.07 Bid cost calculation 22
4.07.01 Determining Bid Price 22
4.07.02 Computing Bid Price 23
4.08 Case study selection criteria 25
4.09 Case Study 25
5.0 DATA ANALYSIS 26
5.01 Overview of Data Analysis 26
5.02 Methodology of Analysis 26
5.03 Ranking the factors affecting the bid strategy for EPC Contract 26
5.03.01 Test of soundness of data 26
5.03.02 Data analysis by RII method 28
5.04 Impact of factors on bidding strategy . 34
5.04 Regression Analysis for Estimation Equation 35
5.04.01 Factors affecting the cost of project (ESR) in the planning phase: 36
5.04.02 Regression Analysis – Model -1 37
5.04.03 Regression Analysis – Model -2 38
6.0 CONCLUSION & FUTURE SCOPE 39
6.01 Conclusion 39
6.02 Future Scope 39
7.0 REFERENCES 40
8.0 ANNEXURE 42
8.01 Questionnaire Survey Form 42
8.02 List of companies 48

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials