Factors affecting the bidding strategy for EPC contract (Softcopy is also available) (Record no. 54888)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04027nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0752 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Parth (UC3813) |
245 #0 - TITLE STATEMENT | |
Title | Factors affecting the bidding strategy for EPC contract (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,48p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1.0 INTRODUCTION 1 <br/>1.01 Background 1 <br/>1.02 Project Delivery and Procurement Methods & Contract Format 1 <br/>1.03 From Contracting to EPC 2 <br/>1.04 Opportunity in EPC in India 2 <br/>1.04 Need for study 3 <br/>1.05 Aim of study 3 <br/>1.06 Objectives of Study 3 <br/>1.07 Scope of work 4 <br/>1.08 Limitations 4 <br/>1.09 Time Frame 4 <br/>2.0 LITERATURE REVIEW 5 <br/>2.01 Overview of EPC Contract 5 <br/>2.02 Overview of Bidding Strategy 5 <br/>2.03 Unviable bidding 6 <br/>2.04 Competitive Bidding 6 <br/>2.05 Bidding Strategy 6 <br/>2.05.01 Lowest Bidding Strategy 6 <br/>2.05.02 Average Bidding 7 <br/>2.05.03 Game Theory Approach for Bidding 7 <br/>2.05.04 A+B Method of Bidding 8 <br/>2.06 Bidding Models 8 <br/>2.07 Critical factors affecting the bidding strategy 9 <br/>2.08 Mark-up estimation reference model 11 <br/>2.09 Summary of Literature Review 12 <br/>2.10 Findings from the Literature Review 13 <br/>2.11 Research Gap 13 <br/>3.0 RESEARCH METHODOLOGY 14 <br/>3.0.1 Research Design 14 <br/>4.0 DATA COLLECTION 16 <br/>4.01 Data Collection Methodology 16 <br/>4.02 Groups of factors for EPC contract 16 <br/>4.03 Identified factors 17 <br/>4.04 Data Collection for Factor Analysis 18 <br/>4.04.01 Pilot Survey 18 <br/>4.04.02 Questionnaire Design 19 <br/>4.04.03 Sampling 19 <br/>4.05 Data of Respondents 20 <br/>4.05.01 Experience in Industry 21 <br/>4.06 Data Collection for designing of bid strategy 22 <br/>4.07 Bid cost calculation 22 <br/>4.07.01 Determining Bid Price 22 <br/>4.07.02 Computing Bid Price 23 <br/>4.08 Case study selection criteria 25 <br/>4.09 Case Study 25 <br/>5.0 DATA ANALYSIS 26 <br/>5.01 Overview of Data Analysis 26 <br/>5.02 Methodology of Analysis 26 <br/>5.03 Ranking the factors affecting the bid strategy for EPC Contract 26 <br/>5.03.01 Test of soundness of data 26 <br/>5.03.02 Data analysis by RII method 28 <br/>5.04 Impact of factors on bidding strategy . 34 <br/>5.04 Regression Analysis for Estimation Equation 35 <br/>5.04.01 Factors affecting the cost of project (ESR) in the planning phase: 36 <br/>5.04.02 Regression Analysis – Model -1 37 <br/>5.04.03 Regression Analysis – Model -2 38 <br/>6.0 CONCLUSION & FUTURE SCOPE 39 <br/>6.01 Conclusion 39 <br/>6.02 Future Scope 39 <br/>7.0 REFERENCES 40 <br/>8.0 ANNEXURE 42 <br/>8.01 Questionnaire Survey Form 42 <br/>8.02 List of companies 48<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Manish (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0752 PAT | 019809 | 22/08/2018 | 22/08/2018 | Thesis |