Image from Google Jackets

Role of project coordination in construction project (Mahatma Mandir - phase 2B) (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: ix,vi,75,ii-xp.,CD-ROMDDC classification:
  • B TH-0751 PAT
Contents:
CONTENTS Acknowledgement i Abstract Index of Tables vi Index of Figuresvii List of abbreviations:viii Chapter: 1 INTRODUCTION: 1 1.1 Background:1 1.2 Need for the study 1 1.3 Objectives:1 1.4 Scope of study:2 1.5 Research Methodology:2 1.6 Research Timeline:3 1.7 Limitations:3 Chapter 2 LITERATURE REVIEW 4 2.1 Introduction to Project Coordination: 4 2.2 Indian Scenario:4 2.3 Critical success factors for a project: 5 2.4 Key role of Project coordinator: 6 2.5 Coordination methods: 7 2.6 Coordination activities: 8 Chapter 3 DATA COLLECTION9 3.1 Methodology for study:9 3.2 Introduction to case study – Mahatma Mandir, Gandhinagar: 9 3.3 Introduction to Phase – 2B (Internal museum structure):11 3.4 Professional advisor’s scope of work:13 3.5 Coordination activity matrix: 14 3.6 Identification of critical issues: 15 3.7 Issue 1 – Bid process management: 17 3.8 Issue 2: Design issues and management: 26 3.9 Issue 3: DBR Approvals: 35 3.10 Issue 4: Study of estimates: 41 3.11 Issue 5: Approval of BOQ: 50 Chapter 4 DATA ANALYSIS 56 4.1 Analysis and findings of issues: 56 4.2 Opinion survey analysis: 65 Chapter 5 CONCLUSION 73 5.1 Overview 73 5.2 Learnings from major issues: 73 5.3 Learnings from qualitative opinion survey with client /contractor /consultant: 74 Chapter 6 SUGGESTIONS 75 6.1 Suggestions: 5 6.2 Future scope of study: 75 7 REFERENCES i 8 ANNEXURES: ii
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0751 PAT Not for loan 019808
Total holds: 0

CONTENTS
Acknowledgement i
Abstract
Index of Tables vi
Index of Figuresvii
List of abbreviations:viii
Chapter: 1 INTRODUCTION: 1
1.1 Background:1
1.2 Need for the study 1
1.3 Objectives:1
1.4 Scope of study:2
1.5 Research Methodology:2
1.6 Research Timeline:3
1.7 Limitations:3
Chapter 2 LITERATURE REVIEW 4
2.1 Introduction to Project Coordination: 4
2.2 Indian Scenario:4
2.3 Critical success factors for a project: 5
2.4 Key role of Project coordinator: 6
2.5 Coordination methods: 7
2.6 Coordination activities: 8
Chapter 3 DATA COLLECTION9
3.1 Methodology for study:9
3.2 Introduction to case study – Mahatma Mandir, Gandhinagar: 9
3.3 Introduction to Phase – 2B (Internal museum structure):11
3.4 Professional advisor’s scope of work:13
3.5 Coordination activity matrix: 14
3.6 Identification of critical issues: 15
3.7 Issue 1 – Bid process management: 17
3.8 Issue 2: Design issues and management: 26
3.9 Issue 3: DBR Approvals: 35
3.10 Issue 4: Study of estimates: 41
3.11 Issue 5: Approval of BOQ: 50
Chapter 4 DATA ANALYSIS 56
4.1 Analysis and findings of issues: 56
4.2 Opinion survey analysis: 65
Chapter 5 CONCLUSION 73
5.1 Overview 73
5.2 Learnings from major issues: 73
5.3 Learnings from qualitative opinion survey with client /contractor /consultant: 74
Chapter 6 SUGGESTIONS 75
6.1 Suggestions: 5
6.2 Future scope of study: 75
7 REFERENCES i
8 ANNEXURES: ii

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials