Role of project coordination in construction project (Mahatma Mandir - phase 2B) (Also available on CD) (Record no. 54887)

MARC details
000 -LEADER
fixed length control field 01936nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180822s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0751
Item number PAT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Patel, Krupal (UC3713)
245 #0 - TITLE STATEMENT
Title Role of project coordination in construction project (Mahatma Mandir - phase 2B) (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent ix,vi,75,ii-xp.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS <br/>Acknowledgement i<br/>Abstract <br/>Index of Tables vi<br/>Index of Figuresvii<br/>List of abbreviations:viii<br/>Chapter: 1 INTRODUCTION: 1<br/>1.1 Background:1<br/>1.2 Need for the study 1<br/>1.3 Objectives:1<br/>1.4 Scope of study:2<br/>1.5 Research Methodology:2<br/>1.6 Research Timeline:3<br/>1.7 Limitations:3<br/>Chapter 2 LITERATURE REVIEW 4<br/>2.1 Introduction to Project Coordination: 4<br/>2.2 Indian Scenario:4<br/>2.3 Critical success factors for a project: 5<br/>2.4 Key role of Project coordinator: 6<br/>2.5 Coordination methods: 7<br/>2.6 Coordination activities: 8<br/>Chapter 3 DATA COLLECTION9<br/>3.1 Methodology for study:9<br/>3.2 Introduction to case study – Mahatma Mandir, Gandhinagar: 9<br/>3.3 Introduction to Phase – 2B (Internal museum structure):11<br/>3.4 Professional advisor’s scope of work:13<br/>3.5 Coordination activity matrix: 14<br/>3.6 Identification of critical issues: 15<br/>3.7 Issue 1 – Bid process management: 17<br/>3.8 Issue 2: Design issues and management: 26<br/>3.9 Issue 3: DBR Approvals: 35<br/>3.10 Issue 4: Study of estimates: 41<br/>3.11 Issue 5: Approval of BOQ: 50<br/>Chapter 4 DATA ANALYSIS 56<br/>4.1 Analysis and findings of issues: 56<br/>4.2 Opinion survey analysis: 65<br/>Chapter 5 CONCLUSION 73<br/>5.1 Overview 73<br/>5.2 Learnings from major issues: 73<br/>5.3 Learnings from qualitative opinion survey with client /contractor /consultant: 74<br/>Chapter 6 SUGGESTIONS 75<br/>6.1 Suggestions: 5<br/>6.2 Future scope of study: 75<br/>7 REFERENCES i<br/>8 ANNEXURES: ii<br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Shah, Reshma (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2013 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 22/08/2018 Faculty of Technology B TH-0751 PAT 019808 22/08/2018 22/08/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials