Lean-led improved design process in healthcare projects (Softcopy is also available) (Record no. 72569)

MARC details
000 -LEADER
fixed length control field 02611nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240906s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CEM TH-0477
Item number MEH
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mehta, Shivam (PCM22428)
245 #0 - TITLE STATEMENT
Title Lean-led improved design process in healthcare projects (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2024
300 ## - PHYSICAL DESCRIPTION
Extent xvii,119p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Table Of Contents<br/>Abstract I<br/>Undert Aking .Iii<br/>Certificate V<br/>Acknowledgements Vii <br/>Abbreviations Ix<br/>Table Of Contents Xi <br/>List Of Figures Xiii<br/>List Of Tables Xv<br/>List Of Appendix Xvii<br/>Chapter-I: Introduction 1<br/>1.1 Need Of Study 2<br/>1.2 Aim 2<br/>1.3 Objectives 2<br/>Chapter-2: Literature Review 3<br/>2.1 Lean Construction 3<br/>2.2 Lean Design 3<br/>2.3 Lean In Healthcare 3<br/>2.4 Value Stream Mapping 4<br/>2.4.1 Important Glossary Of Value Stream Mapping 6<br/>2.4.2 Seven Types Of Waste 7<br/>2.4.3 Waste Drivers 7<br/>2.4.4 Stages Of Design 8<br/>2.4.5 Design Waste In Architectural Design Processes 9<br/>2.4.6 Vsm Of The Design Process In A Design-Build Firm 11<br/>2.4.7 Eliminating Waste: Vsm In Structural Design Firm 11<br/>2.4.8 Minimizing Design Waste In Off-Site Construction 12<br/>2.5 The Conceptual Model For Healthcare Building 13<br/>2.6 Choosing By Advantage 13<br/>2.6.1 Strategic For Applying Choosing By Advantages In Design Process 14<br/>Chapter-3: Research Methodology 17<br/>3 .1 Analysis Of Research Methodology 17<br/>3.2 Action Research 17<br/>3.2.1 Diagnosing 18<br/>3.2.2 Action Planning 18<br/>3.2.3 Action Tak:En 19<br/>3.2.4 Evaluation And Feedback 20<br/>3.2.5 Specifying Learning 20<br/>3.3 Research Methodology Map 20<br/>Chapter-4: Data Collection 23<br/>Chapter-5: Dataanalysis 27<br/>5.1 Project 1: Cancer & Ophthal Centre Project 27<br/>5.1.1 Vsm Current State 27<br/>5.1.2 Identification Of Wastes 32<br/>5.1.3 Future State 34<br/>5.2 Project 2: Urology Hospital, Transplant & Research Centre 38<br/>5.2.1 Vsm Current State For Project 2 38<br/>5.2.2 Identification Of Wastes 41<br/>5.2.3 Future State 43<br/>5.3 Cba- Design Problem: Wall Covering Altematives .47<br/>5.3.1 Strategic Brief By Client 50<br/>5.3.2 Strategic Brief By Designer 51<br/>5.3.3 Strategic Brief By Contractor 53<br/>5.3.4 Strategic Brief By Facility Operator 54<br/>5.3.5 Must/Want Factors 55<br/>5.3.6 Cba Attribute Comparison And Advantage Scoring For Wall Covering 56<br/>5.3.7 Inference 57<br/>Chapter-6: Conclusion 59<br/>6.1 Future Scope 61<br/>References 63<br/>Appendix 69<br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2022 Batch
891 ## - Topic
Topic Construction engineering and Management
891 ## - Topic
Topic FT-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library 06/09/2024 Faculty of Technology CEM TH-0477 MEH 026686 06/09/2024 06/09/2024 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials