Lean-Led improved architectural design process in engineering, procurement, and construction(EPC) projects (Softcopy is also available) (Record no. 72567)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02063nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240906s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0475 |
Item number | RAN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Rane, Viraj (PCM22397) |
245 #0 - TITLE STATEMENT | |
Title | Lean-Led improved architectural design process in engineering, procurement, and construction(EPC) projects (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2024 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xx,141p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | <br/> TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING v <br/>CERTIFICATE vii <br/>ABBREVIATIONS ix <br/>TABLE OF CONTENTS xiii <br/>LIST OF FIGURES xv <br/>LIST OF TABLES xvii <br/>LIST OF APPENDICES xix <br/>CHAPTER-1: INTRODUCTION 1 <br/>1.1 Need of Study 1 <br/>1.2 Work Outline 1 <br/>CHAPTER-2: RESEARCH METHODOLOGY 3 <br/>2.1 Objective of Study 3 <br/>2.2 Scope of Study 3 <br/>2.3 Literature Review 4 <br/>2.4 Action Research 4 <br/>2.4.1 Diagnosis 4 <br/>2.4.2 Action Plan 6 <br/>2.4.3 Action Plan 7 <br/>2.4.4 Evaluation 7 <br/>2.4.5 Specifying Learning 8 <br/>2.5 Research Schedule 9 <br/>2.5.1 Phase 1 Work Breakdown 9 <br/>CHAPTER-3: LITERATURE REVIEW 11 <br/>3.1 Lean Design 11 <br/>3.2 Value in Construction 15 <br/>3.3 Waste in Product Development 16 <br/>3.4 Understanding the Waste Categories 19 <br/>3.4.1 Defects 19 <br/>3.4.2 Overproduction 20 <br/>3.4.3 Waiting 21 <br/>3.4.4 Non Utilized Talent 22 <br/>3.4.5 Transport 23 <br/>3.4.6 Inventory 24 <br/>3.4.7 Motion 25 <br/>3.4.8 Extra Processing 25 <br/>3.5 Waste Drivers in the Design Process 27 <br/>3.6 Comparison of Plans of Work 31 <br/>3.6.1 RIBA Plan of Work (2020) 32 <br/>3.7 Activities identified for each design stage 33 <br/>CHAPTER-4: Value Stream Mapping 34 <br/>4.1 Data Analysis for VSM 34 <br/>4.1.1 Data Collection 34 <br/>4.1.2 Swimlane Chart 35 <br/>4.1.3 Data Analysis 35 <br/>4.2 Current State Value Stream Map 36 <br/>CHAPTER-5: Future state VSM <br/>5.1 Strategies for Future State VSM 39 <br/>CHAPTER-6: Conclusion 41 <br/>REFERENCES 43 <br/>ANNEXURE <br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Devkar, Ganesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2022 Batch |
891 ## - Topic | |
Topic | Construction engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 06/09/2024 | Faculty of Technology | CEM TH-0475 RAN | 026684 | 06/09/2024 | 06/09/2024 | Thesis |