Comparative study of construction methodologies for marine bored cast in-situ piled jetty structures (Softcopy is also available) (Record no. 72546)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04524nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240906s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0454 |
Item number | DAV |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Dave, Disha Jay (PCM22103) |
245 #0 - TITLE STATEMENT | |
Title | Comparative study of construction methodologies for marine bored cast in-situ piled jetty structures (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2024 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xx,108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | <br/> Table Of Contents <br/>Abstract I <br/>Undertaking Iii <br/>Certificate V <br/>Acknowledgements Vii <br/>Abbreviations Ix <br/>Table Of Contents Xi <br/>List Of Figures Xv <br/>Chapter-1: Introduction 1 <br/>1.1 Background Study 1 <br/>1.1.1 Existing Marine Jetty Structures On Indian Shoreline 1 <br/>1.2 Need For Study 3 <br/>1.3 Aim 3 <br/>1.4 Objectives 4 <br/>Chapter-2: Literature Review 5 <br/>2.1 Research Papers 5 <br/>2.1.1 Construction Of Bored Cast-In-Situ Piles Using Rotary Drilling Procedure—A Case Study 5 <br/>2.1.2 Study On Construction Schedule Optimization Of Bored Pile Based On Genetic Algorithm 6 <br/>2.1.3 Cost Modeling Of A Cast-In-Situ Piles In North Eastern Part Of Tamil Nadu: A Case Study At A Selected Pile Construction Site 7 <br/>2.1.4 Comparative Analysis Method Of Work, Time, And Cost Of Concrete Spun Pile Work With Bored Pile On Construction Of The Light Rail Transit (Lrt) 7 <br/>2.1.5 Cost Forecasting Analysis On Bored And Cast-In-Situ Piles In Sri Lanka: Case Study At Selected Pile Construction Sites In Colombo Metropolis Area ...... 8 <br/>2.1.6 An Overview Of Bored Cast In-Situ Concrete Piling Work In Practice .. 8 <br/>2.1.7 Time-Cost Trade-Off Analysis On Jetty Construction Project (Case Study: Indonesian Navy Jetty Construction Project) 9 <br/>2.1.8 Socketing Of Bored Piles In Rock 10 <br/>2.1.9 Estimating Geotechnical Capacity Of Bored Cast-In-Situ Piles From Penetration Resistance 10 <br/>2.1.10 Construction Of Passenger Jetty At Mandwa Using End-On Method .. 11 <br/>2.2 Books 11 <br/>2.2.1 Foundation Design Manual 11 <br/>2.2.2 Pile Design And Construction Rules Of Thumbs 12 <br/>2.2.3 Pile Design And Construction Practice 12 <br/>2.2.4 Soil Mechanics And Foundation Engineering 12 <br/>2.3 Interview Transcript 13 <br/>Chapter-3: Research Methodology 15 <br/>3.1 Introduction 15 <br/>3.1.1 Identifying Construction Methodologies Of Marine Piling 16 <br/>3.1.2 Formulation Of Hypothesis 16 <br/>3.1.3 Data Analysis 16 <br/>3.1.4 Results And Findings 16 <br/>3.2 Bored Cast In-Situ Pile Considerations 17 <br/>3.3 End On Piling Method 19 <br/>3.4 Jack-Up Platform Method 20 <br/>Chapter-4: Components Of Jetty Structures 21 <br/>4.1 Sub Structure 21 <br/>4.1.1 Bored Cast In-Situ Concrete Pile 21 <br/>4.2 Super Structure 22 <br/>4.2.1 Precast Pile Muff 22 <br/>4.2.2 Precast Beams 22 <br/>4.2.3 Precast Planks 24 <br/>4.2.4 Cast In-Situ Concrete 25 <br/>Chapter-5: Construction Methodologies For Marine Jetty Construction 27 <br/>5.1 End On Piling Method 27 <br/>5.1.1 Construction Of Sub Structure 28 <br/>5.1.2 Construction Of Super Structure 32 <br/>5.2 Jack Up Platform Method 32 <br/>5.2.1 Construction Of Sub Structure 33 <br/>5.3 Equipment And Machineries Used 35 <br/>5.3.1 Hydraulic Piling Rig 35 <br/>5.3.2 Tremie Pipes And Hopper 36 <br/>5.3.3 Mobile Cranes 37 <br/>5.3.4 Jack Up Platform 38 <br/>5.3.5 Floating Barges 39 <br/>5.3.6 Gantry Crane 40 <br/>5.3.7 Launcher 41 <br/>Chapter-6: Hypothesis Formulation 43 <br/>6.1 Hypothetical Case Description 43 <br/>6.1.1 Approach Structure 44 <br/>6.1.2 Jetty Structure 46 <br/>6.2 End On Piling Method 48 <br/>6.2.1 Sequential Activities: Approach Construction 49 <br/>6.2.2 Sequential Activities: Jetty Construction 55 <br/>6.2.3 Time Schedule 59 <br/>6.3 Jack-Up Platform Method 62 <br/>6.3.1 Sequential Activities: Approach & Jetty Construction 62 <br/>6.3.2 Time Schedule 67 <br/>Chapter-7: Data Analysis 71 <br/>7.1 Time Comparison 71 <br/>7.2 Cost Comparison 72 <br/>7.2.1 Material & Labour Cost 72 <br/>7.2.2 Equipment And Machinery Cost 78 <br/>7.2.3 Cost Analysis 80 <br/>7.2.4 Time Vs Cost Analysis 80 <br/>Chapter-8: Results And Findings 83 <br/>8.1 Comparative Analysis Review 83 <br/>8.2 Implications For Stakeholders 84 <br/>8.3 Conclusion 84 <br/>Chapter-9: Future Scope Of Research 87 <br/>9.1 Integration Of Hybrid Construction Methodologies 87 <br/>9.2 Beyond Cost And Time: A Multifaceted Evaluation Framework 87 <br/>9.3 Integrating Risk Assessment 88 <br/>9.4 Conclusion 88 <br/>References 89 <br/>Appendix 91<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Mehul (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2022 Batch |
891 ## - Topic | |
Topic | Construction engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 06/09/2024 | Faculty of Technology | CEM TH-0454 DAV | 026663 | 06/09/2024 | 06/09/2024 | Thesis |