Analysis of factors affecting cash flow in construction industry (Soft copy is also available) (Record no. 68423)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02727nam a22001577a 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0379 |
Item number | SHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Shah, Kushal (PT101314) |
245 ## - TITLE STATEMENT | |
Title | Analysis of factors affecting cash flow in construction industry (Soft copy is also available) |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Table of Contents<br/>Chapter 1 Introduction 1<br/>1.1 Introduction I<br/>1.2 Need for Study 1<br/>1.3 Objective 2<br/>1.4 Scope of study 2<br/>1.5 Methodology 2<br/>1.6 Data Coll ection and Analysis 2<br/>Chapter 2 Literature review 3<br/>2.1 Introduction 3<br/>2.2 Net Cash Flow Models 4<br/>2.3 Idiographic Method vs. Nomothetic Method 5<br/>2.4 Cash flow Management-The Indian Scenario 7<br/>2.5 Cash flow forecasting 9<br/>2.5.1 Forecasting cash flow under Indian Conditions 9<br/>2.6 Ideal Curves and Previous Models 11<br/>2.7 Risk and Risk Management: An overview 13<br/>2.7.1 Risk Management 13<br/>2.7.2 Risk Management Strategy 14<br/>2. 7 .2.1 Risk Identification 14<br/>2.7.2.2 Qualitative risk analysis 15<br/>2.7.2.3 Quantitative risk Analysis 16<br/>2.7.2.4 Risk Response plan 16<br/>2.7.3 Probabilistic Cost and Duration Estimating 17<br/>2.7.4 Risk Factors Involved in Modeling Cash Flow Forecast 20<br/>2.8 Research gap 29<br/>2.9 Research Methodology 30<br/>Chapter 3- Field survey for Risk factors Affecting Cash flow 31<br/>3.1 lntroduction 31<br/>3.2 Cash Flow Risk Factors 31<br/>3.2.1 Questionnaire Design . 31<br/>3.2.2 Respondent Profile 32<br/>3.2.3 Data collection 34<br/>3.3 Data validation 46<br/>3.4 Data analysis 48<br/>3.4.1 Relative Importance Index 48<br/>Chapter 4 Risk Integration Framework Development 53<br/>4.1 Introduction 53<br/>4.2 Development of the framework 53<br/>4.3 Framework 53<br/>Chapter 5 Case Study 56<br/>5.1 Introduction 56<br/>5.2 Project Description :. 56<br/>5.3 Planning and Scheduling 56<br/>5.3.1 Work breakdown Structure 57<br/>5.3.2 Scheduling 57<br/>5.3.3 Cost Estimation 58<br/>5.3.4 Risk Implementation 60<br/>5.3.4.1 Assigning three time estimates 60<br/>5.3.4.2 Resource Uncertainty 62<br/>5.3.4.3 Building risk Register 63<br/>5.3.4.4 Building Risk Register 64<br/>5 .3 .4.5 Quantitative Risk register 65<br/>5.3.4.6 Running Risk analysis : 66<br/>5.4 Key Results of Risk Analysis 68<br/>5.4.1 Project Cost variation : 69<br/>5.4.2 Project Duration Variation 70<br/>5.5 Cash out flow generation for various probability 71<br/>5.6 Generating Cash inflow 73<br/>5.7 Net cash flow generation 73<br/>CHAPTER 6 Summary, Conclusions and Recommendations 78<br/>6.1 Summary 78<br/>6.2 Conclusions 78<br/>6.3 Recommendations for Future Work 79<br/>References 80<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sanghvi, Amar (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | 2014 Batch |
891 ## - Topic | |
Topic | Construction planning and Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 03/02/2021 | Faculty of Technology | CPM TH-0379 SHA | 022592 | 03/02/2021 | 03/02/2021 | Thesis |