What is right and wrong with public bicycle sharing scheme in India (Softcopy is also available) (Record no. 68300)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03579nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 201105s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | P TH-2513 |
Item number | RAJ |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Rajput, Vishal Ranjisingh (PG181201) |
245 #0 - TITLE STATEMENT | |
Title | What is right and wrong with public bicycle sharing scheme in India (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2020 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 135,31p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Content <br/>1. Introduction 19 <br/>1.1 Need of the study 19 <br/>1.2 Problem statement 20 <br/>1.3 Aim 20 <br/>1.4 Objective 20 <br/>1.5 Methodology 20 <br/>1.6 Data collection plan 21 <br/>1.7 Scope and limitation 22 <br/>1.8 Background 23 <br/>1.8.1 Global scenario 23 <br/>1.8.2 Indian scenario 24 <br/>2. Literature review 28 <br/>2.1 What is PBS? 28 <br/>2.2 Difference between bicycle share and bicycle rental. 28 <br/>2.3 Evolution of PBS 29 <br/>2.4 Benefits of PBS 29 <br/>2.5 How PBS is planned 31 <br/>2.6 Components of PBS 32 <br/>2.7 Models of Public Bicycle Sharing 34 <br/>2.7.1 Type of contract 34 <br/>2.7.2 Operating model 34 <br/>2.7.3 System parameters of PBS 35 <br/>2.7.4 City specific parameters 39 <br/>1.9 Summary of literature review 41 <br/>1.10 City selection criteria 43 <br/>3. Analysis of the Public Bicycle Sharing 45 <br/>3.1 Mybyk Ahmedabad 45 <br/>3.1.1 City scale analysis 47 <br/>3.1.2 User’s survey 49 <br/>3.1.3 Aspects of system measurement 53 <br/>3.1.4 Evaluation framework 54 <br/>3.1.5 Business model 56 <br/>3.1.6 Advantages and disadvantages 61 <br/>3.1.7 Discussion 62 <br/>3.1.8 Issues and challenges for the system 63 <br/>3.2 Chartered bike, Surat 64 <br/>3.2.1 Users survey 69 <br/>3.2.2 Aspects of system measurement 73 <br/>3.2.3 Evaluation framework 75 <br/>3.2.4 Business model 76 <br/>3.2.5 Incentive and penalty model 80 <br/>3.2.6 Advantages and disadvantages 81 <br/>3.2.7 Discussion 82 <br/>3.2.8 Challenges for the system and users 82 <br/>3.3 Chartered bike, Ranchi 83 <br/>3.3.1 User’s survey 87 <br/>3.3.2 System measurement aspects 90 <br/>3.3.3 Evaluation framework 92 <br/>3.3.4 Business model 93 <br/>3.3.5 Incentive and penalty model 98 <br/>3.3.6 Advantages and disadvantages 99 <br/>3.3.7 Discussion 100 <br/>3.3.8 Challenges for operator and users 100 <br/>3.4 Gbike Gandhinagar 101 <br/>3.4.1 User’s survey 104 <br/>3.4.2 Aspects of system measurement 107 <br/>3.4.3 Evaluation framework 109 <br/>3.4.4 Business model 110 <br/>3.4.5 Advantages and disadvantages 114 <br/>3.4.6 Discussion 115 <br/>3.4.7 Challenges for the operator and users 115 <br/>4. Comparison 117 <br/>5. Recommendations 124 <br/>6. Conclusion and future research direction 127 <br/>7. Reference 128 <br/>A. Appendix-01: Operator questionnaire 131 <br/>B. Appendix-02: User’s survey questionnaire 135<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Bhakuni, Nitika (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2018 Batch |
891 ## - Topic | |
Topic | FP-PG |
891 ## - Topic | |
Topic | Master of Urban Transport Systems |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Planning | CEPT Library | CEPT Library | 06/11/2020 | Faculty of Planning | P TH-2513 RAJ | 022960 | 05/11/2020 | 05/11/2020 | Thesis |