System dynamics approach for demand and revenue riskanalysis of metro rail PPP project in India (Softcopy is also available) (Record no. 56480)

MARC details
000 -LEADER
fixed length control field 04013nam a2200181 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0341
Item number SHA
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Shah, Rishabh Dharmesh (PT102017)
245 ## - TITLE STATEMENT
Title System dynamics approach for demand and revenue riskanalysis of metro rail PPP project in India (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2019
300 ## - PHYSICAL DESCRIPTION
Extent ii,xix,113p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS<br/>ABSTRACT I<br/>UNDERTAKING III<br/>CERTIFICATE V<br/>ACKNOWLEDGEMENTS VII<br/>LIST OF ABBREVIATIONS IX<br/>LIST OF TABLES XV<br/>LIST OF FIGURES XIX<br/> <br/>CHAPTER 1 : INTRODUCTION 1<br/>Background 1<br/>Need for study 2<br/>Objective of study 3<br/>Scope of study 3<br/>Research schedule 4<br/>CHAPTER 2: LITERATURE REVIEW 5<br/>Key risk factors 5<br/>Learnings from the literature review 9<br/>Risk definition 9<br/>Demand risk 9<br/>Revenue risk 10<br/>CHAPTER 3: RESEARCH METHODOLOGY 13<br/>Adopting system dynamics approach 13<br/>Application of SD for PPP infrastructure projects 14<br/>Methodology Adopted by the Relevant Studies 15<br/>Methodology Adopted for current research 16<br/>Model conceptualization 17<br/>Model formulation 18<br/>Model Simulation and Testing 18<br/>CHAPTER 4: DEVELOPMENT OF SYSTEM DYNAMICS MODEL 19<br/>Problem identification 19<br/>Model conceptualization 19<br/>Process of Validation - CLD 20<br/>Validated CLD – Demand Risk 21<br/>Validated causal loop diagram – Demand risk 22<br/>Analysis for causal loop diagram – Demand Risk 22<br/>Discussions from semi structured interviews 23<br/>\Revenue risk 25<br/>Validated factors – Revenue Risk 25<br/>Validated causal loop diagram – Revenue Risk 27<br/>Analysis for causal loop diagram – Revenue Risk 27<br/>Model formulation 29<br/>Definition of system and dynamics 29<br/>Tools of stocks and flow 29<br/>Validation of stocks and flow diagram 30<br/>Process of validation – Stocks and flow diagram 31<br/>Demand risk 32<br/>Assumptions for developing stocks and Flow Diagram – Demand Risk 32<br/>Stocks and flow diagram – Demand Risk 32<br/>Equation for Stocks, Flow and Auxiliary Variables – Demand Risk 32<br/>Revenue risk 44<br/>Assumptions for developing Stocks and Flow diagram – Revenue risk 44<br/>Stocks and Flow Diagram – Revenue Risk 44<br/>Equation for Stocks, Flow and Auxiliary Variables 44<br/>Case study Validation 50<br/>Case study – Mumbai metro rail (Line 1) 51<br/>Introduction 51<br/>Stakeholder details 51<br/>Discussion on Input variables pertaining to Mumbai metro line 1 Case study 51 4.5.3.1 <br/>Planning and construction 52<br/>Operation 55<br/>Revenue 67<br/>Revenue from the rail System 67<br/>Revenue from other sources 68<br/>Model inputs - Summary 69<br/>Model inputs – Demand risk 69<br/>Model inputs – Revenue risk 72<br/>Model validation – Mumbai metro line 1 (case study) 73<br/>Demand risk 73<br/>Population forecast 73<br/>Employment opportunities 74<br/>Capacity of Metro Rail 74<br/>Ridership based on scenarios 75<br/>Demand gap 76<br/>Revenue risk 78<br/>Revenue from rail system inflow 78<br/>Revenue from the real estate development 79<br/>Actual OPEX 80<br/>Revenue 81<br/>CHAPTER 5: CONCLUSION & RECOMMENDATIONS 83<br/>Achievement of research objectives 83<br/>Limitations 84<br/>CHAPTER 6: RECOMMENDATIONS & FUTURE SCOPE 85<br/>Recommendations 85<br/>Future scope 85<br/>REFERENCES 87<br/>APPENDIX 93<br/>Appendix (A) – Interview 1 93<br/>Appendix (B) – Interview 2 94<br/>Appendix (C) – Interview 3 95<br/>Appendix (D) – Interview 4 96<br/>Appendix (E) – Interview 5 97<br/>Appendix (F) – Interview 6 98<br/>Appendix (G) – Interview 7 99<br/>Appendix (H) – Interview 8 100<br/>Appendix (G): Validated causal loop diagram – Demand Risk 101<br/>Appendix (H): Validated causal loop diagram – Revenue Risk 102<br/>Appendix (I): Validated Stocks and flow diagram – Demand Risk 103<br/>Appendix (J): Validated Stocks and flow diagram – Revenue Risk 104<br/>Appendix (K) : Literature Review Table for Problem Identification and Model Conceptualization 105<br/>Appendix (L) : Literature Review Table for Methodology 110<br/> <br/> <br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic 2017 Batch
891 ## - Topic
Topic Construction Planning and Management
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 05/08/2019 Faculty of Technology CPM TH-0341 SHA 021380 05/08/2019 05/08/2019 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials