Institutionalizing the command and control centre (Also available on CD) (Record no. 55553)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02918nam a22001697a 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | MTM TH-0169 |
Item number | LAS |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Lashkari, Tulsi (PM001816) |
245 ## - TITLE STATEMENT | |
Title | Institutionalizing the command and control centre (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xii,72p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>Undertaking ii <br/>Acknowledgement iii <br/>List of figures and tables iv <br/>Abbreviations v <br/>Executive summary vii <br/>Chapter 1: Introduction 1 <br/>1.1 Background study 1 <br/>1.2 Problem statement 2 <br/>1.3 Research topic 3 <br/>1.4 Research scope and limitation 3 <br/>1.5 Research questions 3 <br/>1.6 Research objectives 4 <br/>1.7 Research Methodology 4 <br/>1.8 Use of this research 5 <br/>Chapter 2: Data collection – Literature review 7 <br/>2.1 Context 7 <br/>2.1.1 What are smart cities? 7 <br/>2.1.2 Smart cities around the world 8 <br/>2.1.3 Emergence of smart cities in India 9 <br/>2.1.3.1 Problem of the cities 9 <br/>2.1.3.2 Need for smart cities 10 <br/>2.1.3.3 Declaration of the project 11 <br/>2.1.3.4 Project selection and implementation 11 <br/>2.1.3.5 Project selection and implementation 11 <br/>2.1.3.6 Smart city components 12 <br/>2.2 Background study of Ahmedabad smart city 13 <br/>2.2.1 Smart city components 13 <br/>2.3 Introduction to the integrated command and control centre 14 <br/>2.3.1 Understanding the terminology 14 <br/>2.3.2 Role of command and control centre in smart cities 15 <br/>2.3.3 Benefits of the system 16 <br/>2.4 Case studies for the best practices 16 <br/>2.5 ICCCs in India 20 <br/>2.6 Summary of literature review 23 <br/>Chapter 3: Data collection - Interviews 25 <br/>3.1 Questionnaire for PMCs from other CCCs 25 <br/>3.2 Key findings from interviews 25 <br/>3.3 Questionnaire for ULB officials in Ahmedabad 26 <br/>3.4 Key findings from interviews 27 <br/>Chapter 4: Site study and observations 31 <br/>4.1 Locational details 31 <br/>4.2 Introduction to SASA project 32 <br/>4.2.1 Functions and benefits 32 <br/>4.2.2 Stakeholders 32 <br/>4.2.3 Roles and responsibilities of the stakeholders 33 <br/>4.2.4 Introduction to components of SASA project 36 <br/>4.2.5 Timeline for the project till inauguration 38 <br/>4.3 Key observations 39 <br/>Chapter 5: Recommendations 40 <br/>5.1 Integral components for institutionalisation 40 <br/>5.2 Functional requirements 41 <br/>5.2.1 System study of existing ICT service integrations 41 <br/>5.2.2 Proposal framework for functional requirement of the system 47 <br/>5.3 Technological requirements 63 <br/>5.3.1 Security 63 <br/>5.3.2 Scalability and flexibility 63 <br/>5.3.3 Open standards 64 <br/>5.4 Personnel requirements 65 <br/>5.4.1 Proposed organogram 65 <br/>5.4.2 Recruitment for manpower 67 <br/>5.4.3 Training of manpower 68 <br/>Chapter 6: Conclusion 70 <br/>REFERENCES 71<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Doctor, Gayatri (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FM-PG |
891 ## - Topic | |
Topic | Master in Technology Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Management | CEPT Library | CEPT Library | 31/01/2019 | Faculty of Technology | MTM TH-0169 LAS | 020361 | 31/01/2019 | 31/01/2019 | Thesis |