Role of project coordination in construction project (Mahatma Mandir convention centre : phase - 1A/1B (Also available on CD) (Record no. 54894)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02733nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0758 |
Item number | REB |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Rebello, Aakanksha V. (UC4613) |
245 #0 - TITLE STATEMENT | |
Title | Role of project coordination in construction project (Mahatma Mandir convention centre : phase - 1A/1B (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vi,75,viiip.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>Chapter 1: Introduction 1<br/>1.1 Background 1<br/>1.2 Need 1<br/>1.3 Objectives 1<br/>1.4 Scope 1<br/>1.5 Research Method 1<br/>1.5.1 Literature Review 2<br/>1.5.2 Data Collection 2<br/>1.5.3 Data Analysis 2<br/>1.6 Research Methodology 3<br/>1.7 Research Schedule 3<br/>1.8 Limitation 3<br/>Chapter 2: Literature Review 4<br/>2.1 Introduction To Project Coordination 4<br/>2.2 What Is Project Coordination? 4<br/>2.3 Difference Between Project Manager And Project Coordinator 4<br/>2.4 Functions Of Project Coordinator 5<br/>2.5 Indian Scenario 5<br/>2.6 Project Coordination Methods 5<br/>2.7 Proejct Coordination Goals 6<br/>2.8 Project Coordination Objectives 8<br/>2.9 Key Barriers In Project Coordination 8<br/>Chapter 3: Data Collection And Observations 9<br/>3.1 Project Introduction 9<br/>3.2 Project Location 9<br/>3.3 Project Layout 10<br/>3.4 1A/1B Phase Layout 10<br/>3.5 Project Details 11<br/>3.6 Resources Deployed 11<br/>3.7 Time Line Of Phase 1A/1B 12<br/>3.7.1 Phase 1A 12<br/>3.7.2 Phase 1B 12<br/>3.8 Area Statement 12<br/>3.9 Project Matrix 13<br/>3.10 Issue 1: Bid Process Management 20<br/>3.10.1 EPC Contractor Bid Process 20<br/>3.10.2 Prebid Clarifications 20<br/>3.10.3 EPC Contractor Qualification Criteria 22<br/>3.10.4 PMC Contract Data For Phase 1A 26<br/>3.10.5 PMC Tender Evaluation 27<br/>3.10.6 PMC Qualification Process 27<br/>3.11 Changes In Design 31<br/>3.12 BOQ Approval 37<br/>3.12.1 BOQ Overview 37<br/>3.12.2 BOQ Methodology 37<br/>3.12.3 ₹ 135 Crores 37<br/>3.12.4 ₹ 193 Crores 38<br/>3.12.5 ₹233 Crores 40<br/>3.13 Issue 4: Billing 41<br/>3.13.1 RA Breakup 41<br/>3.13.2 Attachments In Billings 41<br/>3.13.3 RA Example 42<br/>3.13.4 Differences In RA Submitted 42<br/>3.13.5 Price Escalation 44<br/>3.14 Issue 5: Extension-1B 48<br/>Chapter 4: Data Analysis 50<br/>4.1 Issue 1 Analysis: Bid Process Management 50<br/>4.1.1 EPC Contractor Analysis 50<br/>4.2 PMC Analysis 53<br/>4.2.1 Selection Method Observations 53<br/>4.3 PMC Tender Clause Comparison 53<br/>4.4 Issue 3 Analysis: Approvals 54<br/>4.5 Issue 4 Analysis: Billing 57<br/>4.6 Issue 5 Analysis- Extension Of Work 57<br/>4.7 Opinion Survey 59<br/>4.7.1 Respondents 59<br/>4.7.2 Qualitative Interview 59<br/>4.7.3 Quantitative Interview 60<br/>4.7.4 Similarity Variance Analysis 63<br/>Chapter 5: Conclusion 71<br/>Chapter 6: Recommendations 74<br/>6.1 Future Scope Of Study 74<br/>Bibliography 75<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Reshma (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0758 REB | 019815 | 22/08/2018 | 22/08/2018 | Thesis |