Success of urban transport projects : an analysis of BRTS projects funded under JNNURM (Also available on CD) (Record no. 52287)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03944nam a2200157Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | P TH-2199 |
Item number | SHU |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Shukla, Palash |
245 #0 - TITLE STATEMENT | |
Title | Success of urban transport projects : an analysis of BRTS projects funded under JNNURM (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2017 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,101p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS Chapter 1 Introduction 6 1.1 Statement of the research problem 6 1.2 Significance of the study 6 1.3 Research questions 7 1.4 Aim . 7 1.5 General and Specific Objectives 7 1.6 Scope and Limitations 7 1.7 Transportation in India 8 1.8 JnNURM Scheme 9 1.8.1 Introduction 9 1.8.2 Background . 10 1.9 Thesis Organization 11 Chapter 2 Literature Review 13 2.1 Introduction . 13 2.2 Defining Success 14 2.2.1 Perspectives on success in Megaprojects EU Cost Action (2015) 15 2.2.2 Perspectives on success in OMEGA, Dimitriou, H.T. (2015) 17 2.2.3 Perspectives of success from Roger Allport’s studies 19 2.2.4 Perspective of Success from C. Liyanage and F. Villalba-Romero 20 2.3 Success factors/ Key Performance Indicators 22 2.3.1 Performance Indicators used by C. Liyanage & F. Villalba-Romero 23 2.3.2 Success factors used by Roger Allport . 25 2.4 Characteristics of a Bus Rapid Transit System 31 2.4.1 Definition 31 2.4.2 Planning for a Bus Rapid Transit System 32 2.4.3 Practice Guidelines 32 2.4.4 Implementation 38 Chapter 3: Methodology 40 3.1 Evaluating Success from C. Liyanage and F. Villalba-Romero, Qualitative Assessment 40 3.2 Quantitative Assessment 42 Chapter 4: Analysis, Results and Discussion 45 4.1 Ahmedabad City 45 4.1.1 Introduction . 45 4.1.2 How did the project emerge? 46 4.1.3 Policy Implementations 50 4.1.4 Characteristic of the system 53 4.1.5 BRTS Project Ahmedabad (Gujarat) – 2 phases 56 4.1.6 Financial Success 57 4.1.7 Policy Success 57 4.1.8 Durability Success 58 4.1.9 Conclusion 59 4.2 Indore City 60 4.2.1 Introduction 60 4.2.2 Background 61 4.2.3 Indore Bus Rapid Transit System 62 4.2.4 Evaluating Success 77 4.2.5 User/Non-User Survey 80 4.2.6 Quantitative Evaluation 86 4.2.7 Operations 87 4.2.8 Costs. 90 Chapter 5 Conclusion and Recommendations 93 Chapter 6 Bibliography 97 Annexure 99 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Swamy, Shivanand H. M. (Guide) |
891 ## - Topic | |
Topic | 2015 Batch |
891 ## - Topic | |
Topic | FP-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Planning | CEPT Library | CEPT Library | 17/08/2017 | Faculty of Planning | P TH-2199 SHU | 018194 | 18/05/2018 | 18/05/2018 | Thesis |