Assessment of housing policies with reference to urban poor : case Bhopal (Also available on CD) (Record no. 51120)

MARC details
000 -LEADER
fixed length control field 06078nam a2200157Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180516s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number P TH-1028
Item number MIT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mittal, Toshi
245 #0 - TITLE STATEMENT
Title Assessment of housing policies with reference to urban poor : case Bhopal (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2008
300 ## - PHYSICAL DESCRIPTION
Extent 107p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS LIST OF CONTENTS- .. I LIST OF TABLES ..- III LIST OF FIGURES ..- IV EXECUTIVE SUMMERY.- ..V 1. INTRODUCTION- ..1 1.1. URBANISATION IN INDIA ..- .1 1.2. IMPACT OF URBANISATION- 2 1.3. HOUSING SHORTAGE AND URBANISATION ..- ..3 1.4. WHAT IS URBAN POOR- 4 1.5. NEED OF THE STUDY..- 6 1.6. HOUSING SITUATION IN MP.- 7 1.7. RESEARCH QUESTIONS- 8 1.8. AIM ..- 8 1.9. OBJECTIVE- .8 1.10. ANALYTICAL FRAMEWORK- 9 1.11. SCOPE / LIMITATION- ..10 1.12. METHODOLOGY ..- 11 2. HOUSING POLICIES A REVIEW..- 12 2.1. BACKGROUND ..- ..12 2.2. CRITICAL FACTORS FOR HOUSING PROVISION- ..13 2.2.1. LAND SUPPLY ..- .13 2.2.2. ACCESSIBILITY TO HOUSING FINANCE ..- .14 2.2.3. MATERIAL AND TECHNOLOGY- 14 2.2.4. AFFORDABILITY OF HOUSE..- 14 2.2.5. INSTITUTIONAL CAPACITY- ..15 2.2.6. LEGAL FRAMEWORK- ..15 2.3. ACTORS IN THE HOUSING SECTOR ..- .15 2.4. METHODS OF SHELTER DELIVERY ..- .17 2.5. 5 YEAR PLANS ..- ..19 2.6. NATIONAL HOUSING POLICIES- 21 2.6.1. NATIONAL HOUSING POLICY, 1994- ..21 2.6.2. NATIONAL HOUSING AND HABITAT POLICY, 199822 2.6.3. DIFFERENCE IN APPROACH OF 1994 AND 1998 POLICIES.22 2.6.4. NATIONAL URBAN HOUSING AND HABITAT POLICY 2007 23 2.7. STATE HOUSING POLICIES- 24 2.7.1. MADHYA PRADESH HOUSING POLICIES 1981, 1988, 199524 2.7.2. MADHYA PRADESH HOUSING AND HABITAT POLICY, 2007 25 3. HOUSING SHORTAGE IN MP.- ..27 3.1. MADHYA PRADESH PROFILE.- 27 3.1.1. GENERAL PROFILE.- 27 3.1.2. URBAN CENTRES IN MP ..- 28 3.1.3. URBAN POVERTY IN MP.- .29 3.2. BHOPAL AS A CASE STUDY..- .30 3.2.1. GENERAL PROFILE.- 30 3.2.2. DEMOGRAPHIC PROFILE.- ..32 3.2.3. SOCIO - ECONOMIC PROFILE.- 33 3.3. HOUSING SHORTAGE AND SLUMS..- ..34 3.3.1. HOUSING SCENARIO ..- 34 3.3.2. SLUMS ..- ..35 3.3.3. ESTIMATION OF HOUSING SHORTAGE- 38 3.3.4. HOUSING SHORTAGE CATEGORY WISE- 39 3.3.5. PHYSICAL REQUIREMENTS FOR SUPPLY ..- ..40 4. HOUSING DELIVERY MECHANISM- 42 4.1. ADMINISTRATIVE SETUP ..- 42 4.2. MADHYA PRADESH HOUSING BOARD..- 45 4.2.1. GENERAL.- 45 4.2.2. ACTIVITIES OF MADHYA PRADESH HOUSING BOARD..46 4.2.3. ALLOTMENT- ..48 4.2.4. FINANCING ..- 49 4.3. HOUSING BY PRIVATE AGENCIES ..- ..49 4.3.1. BACKGROUND- 49 4.3.2. LAND RESERVATIONS FOR EWS ..- 50 4.3.3. PRESENT STATUS OF PRIVATE COLONIES ..- .51 4.3.4. THE LEGAL PROCEDURE ..- 54 4.4. ISSUES..- 55 4.4.1. SHARE IN SUPPLY OF VARIOUS AGENCIES- ..55 4.4.2. AFFORDABILITY vs. AVAILABILITY- ..56 5. GOVERNMENT INITIATIVES FOR HOUSING FOR URBAN POOR.58 5.1. BACKGROUND ..- ..58 5.2. DEVELOPMENT PLAN- 59 5.3. LAND TENURE SECURITY- ..61 5.3.1. PATTA ACT ..- 61 5.3.2. COVERAGE OF ACT AND PRESENT STATUS ..6- 2 5.3.3. ISSUES..- 63 5.4. SLUM IMPROVEMENT SCHEMES..- 63 5.4.1. SLUM CLEARANCE AND IMPROVEMENT ACT6- 3 5.4.2. NATIONAL SLUM DEVELOPMENT PROGRAMME (NSDP) 1996 64 5.4.3. SLUM NETWORKING PROJECTS ..- 64 5.5. JHUGGI MUKTA AWAS YUKTA YOJANA..- ..65 5.6. VALMIK AMBEDKAR AWAS YOJNA..- 66 5.7. JAWAHARLAL NEHRU NATIONAL URBAN RENEWAL MISSION (JNNURM)..69 5.7.1. JNNNURM IN MP ..- .69 5.7.2. SUB MISSIONS- ..69 5.7.3. HOUSING STRATEGIES UNDER JNNURM IN BHOPAL70 5.7.4. JNNURM PRESENT STATUS..- 71 5.8. ISSUES..- 73 6. CASE STUDIES ..- .75 6.1. SELECTION OF CASE STUDY AND ANALYSIS- .75 6.2. SCHEME I HOUSING SCHEME AT RAJEEV NAGAR78 6.2.1. INTRODUCTION- 78 6.2.2. VARIOUS STAGES IN SCHEME..- 80 6.3. SCHEME II HOUSING SCHEME AT AMRAVATI ..81 6.3.1. INTRODUCTION- 81 6.3.2. VARIOUS STAGES IN SCHEME..- 83 6.4. HOUSEHOLD SURVEY RESULTS ..- .84 6.5. ISSUES..- 90 7. CONCLUSIONS AND RECOMMENDATIONS..- ..92 REFERENCES- ..- 101 ANNEXURE I ..- 104 List of Tables TABLE 1-1: NO. OF HOUSELESS HOUSEHOLDS AND HOUSELESS POPULATION (1961 2001).3 TABLE 1-2: INCOME CATEGORIZATION..- 4 TABLE 1-3: POPULATION BELOW POVERTY LINE IN INDIA..- ..5 TABLE 2-1: SUMMERY OF NATIONAL FIVE YEAR PLANS ..- ..21 TABLE 3-1: SOME FACTS ABOUT MP ..- ..28 TABLE 3-2: URBANIZATION- 29 TABLE 3-3: PERCENTAGE OF MPS URBAN POPULATION IN DIFFERENT CLASSES OF TOWNS .29 TABLE 3-4: SLUM POPULATION IN MAJOR URBAN CENTERS OF MP30 TABLE 3-5: DEMOGRAPHIC CHARACTERISTICS, BHOPAL ..- .32 TABLE 3-6: COMPOSITION OF POPULATION GROWTH..- 33 TABLE 3-7: INCOME GROUPS IN BHOPAL AND THEIR EXPENDING POWER ..34 TABLE 3-8: HOUSING SITUATION IN MP AND BHOPAL..- ..34 TABLE 3-9: CONGESTION FACTOR..- ..35 TABLE 3-10: SLUM POPULATION IN BHOPAL OVER PERIOD OF TIME ..36 TABLE 3-11: EXISTING SLUM POPULATION IN BHOPAL..- .37 TABLE 3-12: PRESENT HOUSING SHORTAGE- 38 TABLE 3-13: POPULATION PROJECTION- 38 TABLE 3-14: HOUSING REQUIREMENT FOR ADDITIONAL POPULATION- ..39 TABLE 3-15: DISTRIBUTION OF NEW HOUSING DEMAND WITHIN SOCIO - ECONOMIC GROUPS 39 TABLE 3-16: DISTRIBUTION OF EXISTING HOUSING BACKLOG WITHIN SOCIO-ECONOMIC GROUPS.39 TABLE 3-17: HOSING DEMAND FOR EWS SECTION OF SOCIETY.- 40 TABLE 3-18: LAND REQUIREMENT FOR HOUSING SUPPLY..- ..40 TABLE 3-19: FINANCE REQUIREMENT FOR HOUSING SUPPLY..- ..41 TABLE 4-1: AGENCIES PROVIDING HOUSING FACILITY IN STATE ..- 44 TABLE 4-2: CATEGORY WISE DETAIL OF PAST WORKS OF MPHB ..4- 7 TABLE 4-3: CATEGORY WISE TARGETS OF MPHB DURING 10TH 5 YEAR PLAN.47 TABLE 4-4: NO. AND STATUS OF PRIVATE COLONIES TAKING PERMISSION EVERY YEAR..52 TABLE 4-5: ANNUAL BACKLOG OF HOUSES FOR EWS ..- .55 TABLE 4-6: AFFORDABILITY LIMIT OF EWS ..- 57 TABLE 4-7: COSTING OF HOUSING UNIT- ..57 TABLE 5-1: COMPONENTS AND THE ACTION PLAN- .59 TABLE 5-2: VAMBAY SCHEME OVERVIEW IN MP.- ..67 TABLE 5-3: VAMBAY SCHEME OVERVIEW IN BHOPAL ..- ..68 TABLE 5-4: IDENTIFIED PROJECTS FOR SLUM REHABILITATION AND IMPROVEMENT UNDER JNNURM..71 TABLE 5-5: DETAIL OF PROJECTS UNDER BSUP IN MP.- ..72 TABLE 6-1: BRIEF OF THE 2 CASE STUDIES.- ..75 TABLE 6-2: BRIEF OF THE HOUSEHOLD SURVEY..- 77 TABLE 6-3: SCHEME DETAIL CASE STUDY I..- 78
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Bharti, Madhu (Guide)
891 ## - Topic
Topic 2006 Batch
891 ## - Topic
Topic FP-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
        Faculty of Planning   CEPT Library CEPT Library 31/07/2008 Faculty of Planning P TH-1028 MIT 002703 18/05/2018 18/05/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials