000 | 02065nam a2200169Ia 4500 | ||
---|---|---|---|
008 | 110102s9999 xx 000 0 und d | ||
082 |
_aB TH-0933 _bVOR |
||
100 |
_aVora, Abhishek (UC8516) _990511 |
||
245 | 0 | _aImpact of heuristic approach and project scheduling approach on the financial and time aspects of a residential project (Softcopy is also available) | |
260 | _c2020-21 | ||
300 | _aviii,54p. | ||
505 | _aINDEX 1 INTRODUCTION 6 1.1 Need for the study 7 1.2 Objective 7 1.3 Scope of the work 7 1.4 Limitations: 7 1.5 Research gap 8 1.6 Research framework 8 1.7 Research timeline 9 2 LITERATURE REVIEW 10 3 RESEARCH METHODOLOGY 14 3.1 Case study details 14 3.2 Project scheduling of Tower-A 15 3.3 Heuristic approach for Tower-A 16 3.4 Project scheduling for Tower-B 20 3.5 Heuristic approach for Tower-B 21 3.6 Material Rates 23 3.6.1 Reinforcement Materials 23 3.6.2 Concrete Materials 23 3.6.3 Formwork Materials 23 3.7 Analysis of reinforcement material for tower-A 24 3.8 Analysis of concrete material for Tower-A 25 3.9 Analysis of reinforcement material for Tower-B 26 3.10 Analysis of concrete material for Tower-B 27 3.11 Analysis of formwork material 28 3.12 Analysis of column formwork 30 3.13 Labour analysis by Project scheduling 31 3.14 Labour Analysis by heuristic Aapproach 33 3.15 Finance cost of steel 36 3.16 Finance Cost of Cement Bags 37 3.17 Comparison of Cost between Project Scheduling and Heuristic Approach 40 3.18 Material Scheduling and Planning 41 3.19 Labour Matrix (Heuristic) 42 4 CONCLUSION 46 4.1 Future Scope 46 5 BIBLOGRAPHY 47 6 ANNEXURE 48 6.1 Supplier’s name 48 6.2 Tower-A floor plan 49 6.3 Tower-B foundation plan 50 6.4 Labour analysis for Tower-B (Project scheduling) 51 6.5 Labour analysis for Tower-B (Heuristic approach) 52 | ||
700 |
_aBakeri, Pavan (Guide) _92018 |
||
890 | _aIndia | ||
891 | _a2016 Batch | ||
891 | _aFT-UG | ||
999 |
_c69697 _d69697 |