000 | 01915nam a2200181Ia 4500 | ||
---|---|---|---|
008 | 110102s9999 xx 000 0 und d | ||
082 |
_aB TH-0877 _bBAN |
||
100 |
_aBansal, Aastha (UC0116) _990445 |
||
245 | 0 | _aEvaluation of implementation of BIM and lean integration for infrastructure project in India (Ahmedabad) (Softcopy is also available) | |
260 | _c2020-21 | ||
300 | _a68p. | ||
505 | _aContents Chapter 1: Introduction 9 1.1 Background 9 1.2 Need for the study. 9 1.3 Objective 10 1.4 Scope of work 10 1.5 Research Timeline 10 Chapter 2 – Literature Study 11 2.1 Background 11 2.2 Real Estate Success - Value creation 11 2.3 Current Scenario of Real Estate Projects 12 2.4 Failure of Real Estate Projects 12 2.5 Factors affecting Real Estate Project 13 2.5.1 Literature Review 13 2.5.2 Identification of Factors 15 2.6 Classification of Factors 16 2.7 Summary 18 Chapter 3 – Research Gap 19 Chapter 4 – Research Methodology 19 4.1 Introduction 19 4.2 Literature Review 19 4.3 Data Collection 19 4.4 Data Analysis 20 4.5 Conclusion 20 Chapter 5 – Data Collection 21 5.1 Methodology Selection 21 5.1.1 Literature Study for selection of Methodology 21 5.1.2 Methodology Used. 21 5.2 Preparation of Survey form 21 5.3 Conducting Pilot Survey 23 5.4 Main Survey 25 5.5 Data Reliability 26 Chapter 6 - Data Analyses 27 6.1 Questionnaire Survey Analysis 27 6.2 Analysis using Relative Importance Index 28 6.3 Cronbach’s Alpha Test (STAGE 1 ANALYSIS) 28 6.4 RELATIVE IMPORTANCE INDEX (STAGE 2 ANALYSIS) 29 6.5 Screen Valuation Indexes 31 Chapter 7 – Conclusion 33 BIBLIOGRAPHY 34 ANNEXURES 35 SURVEY QUESTIONNAIRE (11 Pages) 35 | ||
700 | _aDave, Bhargav (Guide) | ||
700 | _aTrivedi, Jyoti (Guide) | ||
890 | _aIndia | ||
891 | _a2016 Batch | ||
891 | _aFT-UG | ||
999 |
_c69641 _d69641 |