000 01544nam a2200193Ia 4500
008 110101s9999||||xx |||||||||||||| ||und||
082 _aCEM TH-0398
_bTRI
100 _aTripathi, Sechika (PG190877)
_990280
245 0 _aDeveloping framework for BIM based construction projects through eliminating non-value adding activities (Softcopy is also available)
260 _c2021
300 _axi,36p.
505 _aTABLE OF CONTENTS ABSTRACT i UNDERTAKING i CERTIFICATE iii ABBREVIATIONS v LIST OF FIGURES ix LIST OF TABLES xi CHAPTER-1: INTRODUCTION 1 CHAPTER-2: LITERATURE REVIEW 4 2.1 Research Positioning 8 CHAPTER-3: Research methodology 11 CHAPTER-4: data collection 14 4.1 Experience in BIM 14 4.2 Level of Agreement for NVA activities 14 4.3 Occurrence of Activities and Resulting Wastes 15 4.4 Impact on Productivity due to these NVAs 16 CHAPTER-5: data analysis and results 20 5.1 Quantitative Statistics 20 5.2 Inferential Statistics 21 5.2.1 T-test 1: On top 5 NVAs as obtained from Qs2 & Qs3 21 5.2.2 T-test 1: On all NVAs as obtained from Qs2 & Qs3 22 5.3 Criticality Factor 22 5.4 Results 24 5.4.1 Elimination of NVAs as Suggested by Subject Matter Experts 24 5.5 Data Validation 26 CHAPTER-6: Conclusions 28 REFERENCES 30 APPENDIX 32
700 _aAmarnath C.B. (Guide)
700 _aTrivedi, Jyoti (Guide)
890 _aIndia
891 _a2019 Batch
891 _aConstruction Engineering and Management
891 _aFT-PG
999 _c69576
_d69576