000 01742nam a2200169Ia 4500
999 _c68135
_d68135
008 200830s9999||||xx |||||||||||||| ||und||
082 _aB TH-0874
_bTRI
100 _aTrivedi, Jeet (UC5515)
_985719
245 0 _aAutomated green building rating systems for India (Soft copy is also available)
260 _c2020
300 _ax,42p.
505 _aContents 1 INTRODUCTION 1 1.1 GREEN BUILDINGS1 1.2 BUILDING INFORMATION MODELING (BIM) 2 1.3 NEED FOR STUDY 3 1.4 OBJECTIVE 4 1.5 SCOPE OF WORK AND METHODOLOGY 4 1.6 LIMITATIONS OF THE RESEARCH 4 1.7 THESIS TIMELINE 4 2 LITERATURE REVIEW 5 2.1 BUILDING INFORMATION MODELLING (BIM) 5 2.1.1 ADVANTAGES OF BIM 6 2.1.2 DISADVANTAGES OF BIM 6 2.2 GREEN BUILDINGS6 2.2.1 INDIAN GREEN BUILDING COUNCIL (IGBC) 6 2.2.2 PRECERTIFICATION PROCESS 8 2.2.3 IGBC NEW BUILDING CREDITS 9 2.3 GREEN BIM10 2.4 DATA EXTRACTION METHOD 11 2.4.1 EXTERNAL ANALYSIS 11 2.4.2 INTERNAL ANALYSIS 12 2.5 RESEARCH GAP14 3 RESEARCH METHODOLOGY 16 3.1 OVERVIEW 16 3.2 PROPOSED FRAMEWORK 16 3.3 FRAMEWORK FOR PLUG-IN DEVELOPMENT 19 4 DATA COLLECTION 21 4.1 BIM ISSUES USED FOR GREEN BUILDING ANALYSIS 21 4.2 SOFTWARE USED 21 4.3 CASE STUDY 22 4.3.1 CASE STUDY 1 23 4.3.2 CASE STUDY 2 23 4.3.3 CASE STUDY 3 23 5 ANALYSIS 24 5.1 SURVEY ANALYSIS 24 5.2 PRACTICAL APPROACH 26 5.2.1 INPUT PROCESS 28 5.2.2 OUTPUT 32 5.3 ADVANTAGES OF USING PLUG-IN 34 5.4 LIMITATIONS OF PLUG-IN 35 6 CONCLUSION AND FUTURE SCOPE 36 7 REFERENCES 37 8 ANNEXURE i 8.1 QUESTIONNAIRE i 8.1.1 CREDIT EARNED AND ANALYSIS TYPE i 8.1.2 CREDIT ALLOCATION STAGE AND SOFTWARE USED ii 8.2 CONCEPTUAL FRAMEWORK ii
700 _aTrivedi, Jyoti (Guide)
_985720
890 _aIndia
891 _aFT-UG
942 _2ddc