000 | 01439nam a2200181Ia 4500 | ||
---|---|---|---|
999 |
_c56558 _d56558 |
||
008 | 190808s9999||||xx |||||||||||||| ||und|| | ||
082 |
_aB TH-0829 _bSHA |
||
100 |
_aShah, Ruju (UC6014) _983029 |
||
245 | _aContractual clauses for BIM enablad projects (Softcopy is also available) | ||
260 | _c2019 | ||
300 | _aii,4,47p. | ||
505 | _aContents 1 Introduction 1 1.1 Background 1 1.2 Need for the study 1 1.3 Objectives 2 1.4 Research Question 2 1.5 Scope of work 2 1.6 Research design 2 1.7 Resources Required 3 1.8 Expected outcome & usefulness of the finding 3 2 Literature Study 4 2.1 BIM and construction contracts 4 2.1.1 Worldwide Adoption 5 2.1.2 Previous studies and further scope 7 2.2 Literature study: Identification of Research methods 8 2.3 Literature review and summary 9 3 Research Methodology 11 4 Data Collection and Review 14 4.1 Preliminary Data Collection 14 4.2 Case Studies: Selection and Review 15 4.2.1 Nagpur Metro Rail Project 15 4.2.2 Ahmedabad Metro Rail Project 17 4.3 Project Delivery Method 22 4.4 Areas for Qualitative study 22 5 Data Validation and Output 28 5.1 Criteria for Clauses for Design and Build Project 38 6 Future scope of Thesis and Limitations 41 6.1 Limitations 41 Bibliography 42 Annexure 44 | ||
700 |
_aKaria, Nimitt (Guide) _983030 |
||
700 |
_aPandit, Devanshu (Guide) _983031 |
||
890 | _aIndia | ||
891 | _aFT-UG | ||
891 | _a2014 Batch |