000 | 02065nam a22001817a 4500 | ||
---|---|---|---|
999 |
_c56467 _d56467 |
||
082 |
_aCPM TH-0335 _bLOT |
||
100 |
_aLota, Paramjit (PT101417) _970802 |
||
245 | _aChallenges and opportunities to adoption of BIM and lean practices in commercial projects - Ahmedabad (Soft copy is also available) | ||
260 | _c2019 | ||
300 | _aii,xix,122p. | ||
505 | _aCONTENTS ABSTRACT i UNDERTAKING v CERTIFICATE vii CERTIFICATE OF PARTICIPATION ix ACKNOWLEDGEMENTS xi ABBREVIATIONS xiii CHAPTER-1: INTRODUCTION 1 1.1 Conceptual Overview 2 1.2 Need for the Study 12 1.3 Objectives & Scope of Work 14 1.4 Research Contribution 16 1.5 Research Impact 17 1.6 Research Timeline 18 CHAPTER - 2: LITERATURE REVIEW 19 2.1 Description of Literature Reviewed 20 CHAPTER - 3: RESEARCH METHODOLOGY 39 3.1 Steps in Action Research 40 3.2 Stepwise description of Research Methodology 45 CHAPTER - 4: DIAGNOSING 47 4.1 Semi-structured Interviews 47 4.2 Critical Points Highlighted 49 4.3 Summary of Challenges and Opportunities 51 CHAPTER - 5: ACTION PLANNING 53 5.1 Implementation Phase - I: Project Brown 53 5.2 Implementation Phase - II: Project Green 55 CHAPTER - 6: ACTION TAKING 57 6.1 Implementation Phase - I: Project Brown 58 6.2 Implementation Phase - II: Project Green 64 CHAPTER - 7: EVALUATION 77 7.1 Implementation Phase - I: Project Brown 77 7.2 Implementation Phase - II: Project Green 80 8. CHAPTER - 8: SPECIFYING LEARNING 85 8.1 4D BIM Adoption Framework 85 8.2 Reinforcing the BIM Adoption Strategy 86 8.3 BIM and Lean Interaction Matrix 87 8.4 Mapping the Observations to Literature 89 CONCLUSION 91 FUTURE SCOPE 93 REFERENCES 95 APPENDIX 99 Appendix - I 101 Appendix - II 102 Appendix - III 111 Appendix - IV 114 Appendix - V 116 Appendix - VI 118 Appendix - VII 120 Appendix - VIII 121 Appendix - IX 122 | ||
700 |
_aDave, Bhargav (Guide) _970803 |
||
700 |
_aTrivedi, Jyoti (Guide) _970804 |
||
890 | _aIndia | ||
891 | _aFT-PG | ||
891 | _a2017 Batch | ||
891 | _aConstruction Planning and Management |